Roads & Transport Authority – Mohammed Al Munji:

The Director-General and Chairman of the Board of Executive Directors of Dubai’s Roads and Transport Authority (RTA) HE Mattar Al Tayer announced that the first of the new Dubai Metro trains would arrive in Dubai in November, and the last one would arrive by the end of October 2019. Al Tayer made this announcement after attending the technical test run of the first train on a 500m test track at Alstom Company’s factory in Poland. The new metro carriages manufacturing progress had reached 10% at the facility.

The train rolled over the test track at varying speeds, and multiple tests were carried out on the safety systems, electric propulsion, braking system, emergency stops and the train doors operating systems.

Attendees besides Al Tayer, included Abdul Mohsen Ibrahim Younes, CEO of Rail Agency, Abdul Rida Abu Al Hassan, Executive Director of Rail Planning and Projects in addition to directors & engineers from RTA and Alstom.

Al Tayer inspected the interiors of the new rail carriages, which are being manufactured under a contract for the supply of 50 trains, 15 of which will be deployed to serve Expo 2020 and 35 will be used to enhance Dubai Metro service.

Al Tayer checked the additions and improvements introduced to the interior design of the metro carriages such as dedicating the last carriage for women and children and leaving part of the first carriage for the Gold Class. Other carriages will be of Silver Class. Seats will be transversal in the Gold Class, and longitudinal in the Silver Class as well as women & children’s carriage. The improved design will increase the intake of trains by 8% from 643 riders to 696 riders. The exterior design of trains will remain unchanged to maintain the design identity of Dubai Metro and its familiar colours to the public,” said Al Tayer.

Additions include revamping the designs, without affecting the identity of handles, lighting, and locations of digital signage (VBSD). They also include an illuminated dynamic map for the metro route & stations, using LED power-saving lighting system, and modifying the design of the luggage compartment to make it usable by standing commuters. Improvements also cover the shape and number of handles, the use of modern digital display systems, distributing seats at the two sides of the train and increasing the gangway connecting between carriages. The new carriages are customised to be used by People of Determination and the smooth boarding and alighting of riders.

Al Tayer described the technical test run of trains as a milestone in the construction of Route 2020 Project, which involves the extension of the Dubai Metro Red Line 15 km from Nakheel Harbour & Tower Station to the site of Expo 2020.

During the technical trial run, tests were conducted to ensure the readiness of the train along with the functioning and performance of all control systems under all conditions. Tests will continue until the shipment of the train to ensure the reliability of results. Tests will cover a wide range of issues such as the air-conditioning system, electrical feed & braking system, coupling of coaches, disconnecting of power supply, rail monitoring & control system, and operational tests of the train under normal and emergency conditions,” elaborated Al Tayer.

-Ends-

© Press Release 2018

Disclaimer: The contents of this press release was provided from an external third party provider. This website is not responsible for, and does not control, such external content. This content is provided on an “as is” and “as available” basis and has not been edited in any way. Neither this website nor our affiliates guarantee the accuracy of or endorse the views or opinions expressed in this press release.

The press release is provided for informational purposes only. The content does not provide tax, legal or investment advice or opinion regarding the suitability, value or profitability of any particular security, portfolio or investment strategy. Neither this website nor our affiliates shall be liable for any errors or inaccuracies in the content, or for any actions taken by you in reliance thereon. You expressly agree that your use of the information within this article is at your sole risk.

To the fullest extent permitted by applicable law, this website, its parent company, its subsidiaries, its affiliates and the respective shareholders, directors, officers, employees, agents, advertisers, content providers and licensors will not be liable (jointly or severally) to you for any direct, indirect, consequential, special, incidental, punitive or exemplary damages, including without limitation, lost profits, lost savings and lost revenues, whether in negligence, tort, contract or any other theory of liability, even if the parties have been advised of the possibility or could have foreseen any such damages.