Muscat: The main water pumping station at the Sohar Industrial Port, which connects to North Al Batinah and Al Buraimi governorates, is witnessing an electrical failure.

According to the Public Authority for Water (DIAM), “The emergency plan was activated to deal with the situation by activating the interconnection between the desalination plants in Barka and Sohar and operating well fields so that these measures will ensure the continuity of water supply during repairs within the next 48 hours.”

“We value your cooperation in rationalizing water consumption during the repair period,” the statement added.

© Muscat Media Group Provided by SyndiGate Media Inc. (Syndigate.info).

Disclaimer: The content of this article is syndicated or provided to this website from an external third party provider. We are not responsible for, and do not control, such external websites, entities, applications or media publishers. The body of the text is provided on an “as is” and “as available” basis and has not been edited in any way. Neither we nor our affiliates guarantee the accuracy of or endorse the views or opinions expressed in this article. Read our full disclaimer policy here.