14 March 2008
Her Majesty The Queen officially opens British Airways' exclusive new 4.3 billion home today (Friday, March 14) - Heathrow Airport's Terminal 5.

Built on time and on budget by airport operator BAA, the new terminal will open for business for up to 30 million passengers a year in thirteen days time on March 27, 2008. British Airways' Middle East travellers will get their first taste of Terminal 5 on April 30 - when phase two of the opening takes place with flights transferring from T4.

The Queen, who has a long association with Heathrow, opened the airport's first passenger terminal, the Europa Building (now called Terminal 2), over half a century ago in 1955.

Accompanied by The Duke of Edinburgh, The Queen will initially be greeted by hundreds of airport and construction workers, in front of a backdrop of giant screens, depicting shots celebrating the construction of Terminal 5.

The Royal Party will be met at the departures concourse of Terminal 5 by Sir Nigel Rudd, chairman of airport operator BAA, which has funded the long-awaited development.

Also present, will be the Rt. Hon Ruth Kelly, Secretary of State for Transport, Rafael del Pino, Executive Chairman Grupo Ferrovial which owns BAA, as well as British Airways chairman Martin Broughton and British Airways chief executive Willie Walsh.

Willie Walsh, British Airways Chief Executive, said: "Terminal 5 is a fantastic facility and our customers will really enjoy the space, comfort and convenience it offers. We have exclusive use of the terminal and that will allow us to greatly improve the levels of service we can offer. The customer experience at Terminal 5 will rival, if not exceed, that at any airport in the world.

"With the opening of Terminal 5, British Airways and BAA have an opportunity to make air travel, both into and out of the UK, once again a calmer and much more enjoyable experience. We intend to take full advantage of that opportunity and can't wait to open the doors to our customers."

Sir Nigel Rudd, chairman of BAA, said: "Terminal 5 marks the start of a new beginning for Heathrow, for BAA and for our millions of passengers. It is, by any standard, a triumph of ambition, commitment and collaboration. It will breathe new life into Heathrow, allowing us to continue our transformation of the rest of the airport, and will put Heathrow and BAA back where they belong - at the leading edge of global travel.

"Terminal 5 will soon be the starting point for many exciting journeys and it will be a place too for many happy reunions, as travellers come home to loved ones. Today, before those journeys begin, we can look and admire a magnificent building - a source of huge pride for BAA as a company, but also for all those individuals who have invested so much of their lives in its creation."

Prior to inaugurating Terminal 5, The Queen, alongside 800 invited guests including senior figures from government, the worldwide aviation industry, business and airport workers, will enjoy a musical finale by a 30-strong choir, led by award winning composer and musician Steve Sidwell. The choir will perform a specially commissioned choral composition, to mark the new terminal coming to life.

The bright, airy new terminal at Heathrow, with British Airways as sole airline occupant, is set to help transform the passenger experience at Heathrow. It will offer passengers a simple and stress-free experience through online check-in and fast bag drop facilities, with the benefit of state-of-the-art security and baggage facilities.

Some 60,000 people have put in a total of 100 million man hours to build Terminal 5, since construction work began in September 2002.

The Terminal 5 project team has successfully erected the UK's biggest free-standing building; moved the 900-tonne top cab of a new 87m high control tower 2km across the airfield; tunnelled over 13km for rail and baggage links; diverted two rivers; and installed over 30,000 sq metres of glass building facades. All Terminal 5's footprint is contained within a former sludge works at the western end of the existing airport, situated between the two runways, adjacent to the M25.

The Terminal 5 complex features 60 new aircraft stands; two satellite buildings, the second of which (phase 2) will be completed by 2010; rail links to London Underground and Heathrow Express; a new multi-storey car park; and extensive landscaping.

Designed by 2006 Stirling Prize winner Rogers Stirk Harbour + Partners, the building's design meets the needs of the passenger from the moment they arrive at the airport to boarding their aircraft. It offers space, convenience, comfort and spectacular views across the airfield for virtually every step of the passenger's journey.

-Ends-

About British Airways:
British Airways has a worldwide route network of over 145 destinations in more than 70 countries. Last year, British Airways was voted "Airline of the Year" by frequent travellers from across the world at the Official Airline Guide (OAG) Airline of the Year Awards.

British Airways has been operating in the UAE for 75 years and currently operates 27 flights per week - 20 from Dubai and a daily service from Abu Dhabi - to London Heathrow.

British Airways is one of the world's largest international airlines carrying approximately 36 million passengers around the world every year.

British Airways will move into its new home at London Heathrow's Terminal 5 on March 27, 2008. Terminal 5 will transform the flying experience for the millions of British Airways' customers who pass through Heathrow each year. The terminal will be capable of handling 30 million customers a year.
For further information on British Airways visit www.ba.com


Notes to Editors:
TERMINAL 5 FACTS
Cost 4.3bn
Construction Sept 2002 - Mar 2008
No. of Passengers annually 30 million
Phase 1 - opening 2008 Terminal 5A and B 50 aircraft stands (total)
Phase 2 - opening 2010 Terminal 5C 60 aircraft stands (total)
Terminal 5A dimensions 396m long x 176m wide x 40m high
Levels above ground 4
Terminal 5B dimensions 442m long x 52m wide x 19.5m high
Levels above ground 3
Multi-storey car park 3,800 spaces
Sofitel London Heathrow Hotel 605 rooms (opens June)
Rail links Heathrow Express London Underground Piccadilly Line
Check-in self service kiosks 96
Check-in fast bag drops over 90
Check-in standard desks 54
Security zones 2 (north and south)
Security lanes 20
Baggage reclaim belts 11
Length of bag conveyers 17 km
No of bags processed per hour 12,000
Number of lifts 192
Number of escalators 105
Number of seats 9,140 (excluding catering outlets)
Number of toilet blocks 112
Number of toilets 800
Number of baby change facilities 32
Childrens' play areas 3 (for toddlers to 7 year olds)
Number of retail facilities 112 (including 25 food and drink outlets)
Percentage of space given to retail Around 5.5 %
For more information,please contact:

For more information,please contact:
Euan Megson
MCS/Action
PO Box 20970
Dubai
United Arab Emirates.
Tel: +9714 390 2960
Fax: +9714 390 8161
Email: euan.m@actionprgroup.com

David Fairservice
MCS/Action
PO Box 20970
Dubai
United Arab Emirates.
Tel: +9714 390 2960
Fax: +9714 390 8161
Email: david.f@actionprgroup.com

Press Release 2008