19 February 2015
Alderley FZE, a subsidiary of Alderley plc, announces the successful delivery of a crude oil bi-direction prover and analysers for the Gazprom Neft (Gazprom) Badra Oilfield Development Phase II Project in Wasit province, Iraq. 

The scope covers the sales contract for oil fiscal measurement using a bi-directional prover with inlet/outlet 10" 600#, 16" prover loop.  The system includes an inbuilt proving tank for in-house calibration. The crude oil quality measurement unit comes complete with a H2S Analyser, Reid Vapor Pressure (RVP) Analyser, Pour Point Analyser and a Salt in Crude Analyser. 

Adrian Philips, Managing Director at Alderley FZE comments, "This is the second contract we have supplied for the Badra Oil Field, both measuring the fiscal transfer of oil. We are proud to be working again with Gazprom in Iraq."

The systems were engineered, designed and manufactured at Alderley's Jebel Ali, Dubai, facilities. 

Alderley FZE is part of the Alderley Group and is the firm's largest operating company overseas. Alderley FZE provides the full range of services for engineering, supply and operation of bespoke metering and produced water treatment solutions to the oil and gas industry.  

About Alderley
Alderley is a multi-disciplined engineering company operating in the oil, gas and petrochemical industries producing effective and efficient solutions for the metering, processing, treatment and control of hydrocarbon products. Alderley has a long heritage in the oil and gas industry and has supplied more than 750 systems to more than 50 countries. Alderley has headquarters in the UK, and regional facilities in the UAE, Russia, Kingdom of Saudi Arabia and Singapore. More about Alderley can be found at www.alderley.com 

© Press Release 2015