The renovation works involved levelling horizontal curves and removing a lane adjoining a mountain thereby solving the problem of rocks falling on the road endangering the lives of motorists as well as installing rockfall protection in other locations.

The project also involved construction of three rest houses, a 1.5 km walkway, wave breakers and 45 viaducts beside upgrading some intersections along the road.

The Khasab-Taibat rehabilitation and improvement project after a geological study concluded that falling rocks from adjacent mountains could pose a real threat to vehicles plying the road and cause serious accidents. — ONA

2020 © All right reserved for Oman Establishment for Press, Publication and Advertising (OEPPA) Provided by SyndiGate Media Inc. (Syndigate.info).

Disclaimer: The content of this article is syndicated or provided to this website from an external third party provider. We are not responsible for, and do not control, such external websites, entities, applications or media publishers. The body of the text is provided on an “as is” and “as available” basis and has not been edited in any way. Neither we nor our affiliates guarantee the accuracy of or endorse the views or opinions expressed in this article. Read our full disclaimer policy here.