21 May 2008
the Company sign a contract to procure the latest state of the art a new longitudinal submerged arc welding plant with a total capacity of 288000 metric ton per year to produce pipes from 16" upto 60" with wall thickness upto 35 mm with steel grade upto API-SL X-80.
- Ends -
the Company sign a contract to procure the latest state of the art a new longitudinal submerged arc welding plant with a total capacity of 288000 metric ton per year to produce pipes from 16" upto 60" with wall thickness upto 35 mm with steel grade upto API-SL X-80.
- Ends -
© Press Release 2009



















