Mozambique Megaruma Dam and Pemba Water Supply Expansion Project - Details on ZAWYA UAE Edition
added on: 13 April 2020

Mozambique Megaruma Dam and Pemba Water Supply Expansion Project

Ongoing

Background

National Directorate for Water Supply and Sanitation planned to develop Mozambique Megaruma Dam and Pemba Water Supply Expansion Project, in Pemba, Cabo Delgado, Mozambique. China Gezhouba Group International Engineering Co Ltd was the EPC contractor. Its construction contents comprise of the construction of a clay core concrete gravity dam with a length of 2,713 meters and a height of 35 meters, a diversion channel with a length of 2 km, a plant with an installed capacity of 1×8.15 MW on the left bank of the river; construction and restoration of an access road with a length of 4.5 km; pavement of a water pipeline of DN1000mm and DN800mm with a length of 102.9 km; and construction of a water treatment station with a capacity of 2 square meters per second. Upon completion, this project would greatly improve living conditions of local residents, create local employment opportunities, and promote social stability and economic development. Besides, this project could benefit a lot to the Belt and Road Initiative. This project was Gezhouba Group ’s first EPC project in Mozambique.
Country
Sub-Sector
Water
Facility Type
Dam
Ownership Type
Project Type

Find Out More Information

Screen, analyze and compare projects in the Middle East and North Africa across Infrastructure, Real Estate, Industrial and Energy sectors with Refinitiv’s Eikon.

LEARN MORE

Find Projects

most viewed projects