• Al Tayer: The project raises the intake of the entry/exit points of the area at Hessa street by 1500 vehicles per hour

In line with Dubai’s Master Plan for Internal Roads of Residential Districts endorsed by His Highness Sheikh Mohammed bin Rashid Al Maktoum, Vice-President, Prime Minister of the UAE, Ruler of Dubai, and the directives of His Highness Sheikh Hamdan bin Mohammed bin Rashid Al Maktoum, Crown Prince of Dubai and Chairman of the Executive Council, Dubai’s Roads and Transport Authority (RTA) has awarded a contract for constructing internal roads at Al Barsha South 3 to meet the needs of demographic growth and urbanisation in the area, and raise the happiness and wellbeing of residents.

“Constructing internal roads stems from RTA’s keenness to upgrade the basic infrastructure of roads, streetlights and rainwater drainage systems at residential areas. This project, which involves the construction of internal roads spanning 6.4 km, is situated at the Mohammed bin Rashid Gardens. It is surrounded by Al Barsha South 2 to the north, Al Hebiah 1 and 4 to the south, Motor City, Sports City and Arjan to the east, and Al Barsha South 4 to the west. The project works also includes streetlights, car parks and bus stops,” explained Al Tayer.

“The project facilitates access to the recently developed district of Al Barsha South 3 to serve about 4,500 inhabitants. It improves the connectivity of the area by raising the capacity of entry/exit points of Hessa St. by 1500 vehicles per hour. It also improves the connection with residential districts under construction, such as the existing road network of Arjan, which will ease the movement to and from Umm Suqeim St as well as the roads network of Al Barsha South 2.

“RTA intends to undertake the construction of internal roads at Al Quoz 2 in the area between Al Khail and Meydan Roads together with main roads network extending 16 km. It also plans to carry out infrastructure works that include rainwater drainage network, streetlight works, safe pedestrian lanes and levelling the alleyways between houses.

“RTA has plans to pave internal roads extending 12 km at Nad Al Sheba 2. This residential community is bordered by three main roads: Dubai – Al Ain Road towards the west, Nad Al Hamar St towards the east and south, and Al Manama St towards the north. Construction works to be carried out include parallel parking, streetlights, rainwater drainage system and sewage network. It will also assess the condition of internal roads stretching 27 km from engineering, traffic safety and drainage of rainwater perspectives. Connecting roads will be paved to serve all land plots in the area, and two new entry/exit points for Al Manama and Nad Al Hamar Streets will be constructed to enhance the link with the neighbourhood. Such works aim to raise the efficiency of traffic movement, improve safety and ease the connectivity with the surrounding areas.

-Ends-

Send us your press releases to pressrelease.zawya@refinitiv.com

© Press Release 2021

Disclaimer: The contents of this press release was provided from an external third party provider. This website is not responsible for, and does not control, such external content. This content is provided on an “as is” and “as available” basis and has not been edited in any way. Neither this website nor our affiliates guarantee the accuracy of or endorse the views or opinions expressed in this press release.

The press release is provided for informational purposes only. The content does not provide tax, legal or investment advice or opinion regarding the suitability, value or profitability of any particular security, portfolio or investment strategy. Neither this website nor our affiliates shall be liable for any errors or inaccuracies in the content, or for any actions taken by you in reliance thereon. You expressly agree that your use of the information within this article is at your sole risk.

To the fullest extent permitted by applicable law, this website, its parent company, its subsidiaries, its affiliates and the respective shareholders, directors, officers, employees, agents, advertisers, content providers and licensors will not be liable (jointly or severally) to you for any direct, indirect, consequential, special, incidental, punitive or exemplary damages, including without limitation, lost profits, lost savings and lost revenues, whether in negligence, tort, contract or any other theory of liability, even if the parties have been advised of the possibility or could have foreseen any such damages.