Thursday, May 28, 2015

Abu Dhabi: Abu Dhabi Terminals (Adt), manager and operator of Khalifa Port Container Terminal (Kpct), opened a polymer packing facility which is centrally located inside the container terminal.

The packing facility, with an annual production capacity of 700,000 metric tonnes, was designed and constructed by ADT to provide Borouge, a leading provider of innovative, value creating plastics solutions, more flexibility in their supply chain network.

Staff Report

Gulf News 2015. All rights reserved.