220 kV Dhabeji Grid & Transmission Line Project - Details on ZAWYA MENA Edition
added on: 11 January 2021

220 kV Dhabeji Grid & Transmission Line Project

Ongoing

Background

K-Electric Ltd.planned to develop 220 kV Dhabeji Grid & Transmission Line Project, in Thatta, Sindh, Pakistan. China XD Group Co Ltd was the EPC contractor of the project who would be in charge of the design, survey, supply, civil engineering, construction, installation, and field test of the transmission lines. The project covered the design, survey, supply, civil engineering, construction, installation, and field test of a total length of 13 km transmission lines, which were made up of a 11.5km 220kV double-circuit four-split overhead transmission line and a 1.5km 220kV double-circuit buried cable line. The total construction period was expected to be 18 months. The project would be connected to the DHABEJI substation in Karachi. It promoted Belt & Road Initiative cooperation between Pakistan and China.
Country
Sub-Sector
Power
Facility Type
Power Transmission Line
Ownership Type
Project Type

Find Out More Information

Screen, analyze and compare projects in the Middle East and North Africa across Infrastructure, Real Estate, Industrial and Energy sectors with Refinitiv’s Eikon.

LEARN MORE

Find Projects

most viewed projects