Jul 21 2011 |
more articles from
|
PetroRabigh swings into loss
JEDDAH - Saudi PetroRabigh posted a SR402.3 million ($107 million) loss in the second quarter after a two-month closure of its refinery slashed sales.
The joint venture of state-owned oil company Saudi Aramco and Japan's Sumitomo Chemicals posted a net profit of SR121.8 million in the second quarter of 2010.
But the closure of the complex for maintenance from April 21-June 30 hit sales for the comparable period of 2011 hard.
"The reason for the loss in the second quarter... is the substantial decrease in sales resulting from loss of production during the shutdown period of the complex for test and inspection maintenance," the firm said in a statement.
Operational losses for the second quarter were SR389 million, compared to a profit of SR83 million in the same quarter last year, it said.
PetroRabigh started operations at its $10.1 billion complex in 2009. Aramco and Sumitomo Chemical each have 37.5-percent stakes in the joint venture, while the rest is publicly held.
The refinery, which caters mainly to the Saudi, European and North African markets, can process 400,000 barrels of crude per day, accounting for about 19 percent of Saudi Arabia's total refining capacity.
PetroRabigh can produce an annual 18 million tons of refined products and 2.4 million tons of petrochemical products.
Ziad S. Al-Labban, President and CEO of Petro Rabigh, said in earlier published report that "it is through the investment which PetroRabigh has made in its integrated refining and petrochemical complex that the company will create more value from hydrocarbon resources of the Kingdom through conversion into higher valued refined and petrochemical products, which will support downstream projects. The company's investments will create jobs for Saudis, support expansion of the Saudi economy through its RPP and create value for its shareholders through its profitable operations."
PetroRabigh is expected to complete its 275,000 tpa phenol project in Rabigh in 2014, John Derbyshire, president of KBR's technology division, said. The company is providing the basic engineering and technology for the project, and is working with Japanese engineering and construction firm JGC Corp. on the front-end engineering and design (FEED) package.
The phenol project forms part of PetroRabigh 's plans to widen the product slate and debottleneck the ethane cracker at its refinery and petrochemicals complex.
Zawya Comment Policy
-
Zawya encourages you to add a comment to this discussion. You agree that when you add content to this discussion your comments will not:
1.1 Contain any material which is libelous or defamatory of any person, is obscene, offensive, hateful or inflammatory or causes damage to the reputation of any person or organisation.
1.2 Promote sexually explicit material, violence, discrimination based on race, sex, religion, nationality, disability, sexual orientation or age or any illegal activity.
1.3 Be made in breach of any legal duty owed to a third party, such as a contractual duty or a duty of confidence.
1.4 Be threatening, abuse or invade another's privacy, or cause annoyance, inconvenience or needless anxiety.
1.5 Be used to impersonate any person, to misrepresent your identity or affiliation with any person, or be likely to deceive any person.
1.6 Give the impression that they represent Zawya.
1.7 Advocate, promote or assist any unlawful act such as (by way of example only) copyright infringement or computer misuse. - The content posted on www.zawya.com is created by members of the public. The views expressed are theirs and unless specifically stated are not those of Zawya. Zawya reserves the right to review all comments prior to posting and edit or delete any contribution, but Zawya is not responsible for and can not be held liable for any content posted by members of the public on www.zawya.com.
- Zawya is not responsible for the availability or content of any third party sites that are accessible through www.zawya.com. Any links to third party websites from www.zawya.com do not amount to any endorsement of that site by Zawya and any use of that site by you is at your own risk.
- By submitting your comment, you hereby give Zawya the right, but not the obligation, to post, air, edit, exhibit, telecast, webcast, re-use, publish, reproduce, use, license, print, distribute or otherwise use your comments worldwide, in perpetuity.
Copyright © 2012 Zawya Ltd. All rights reserved. |
provided by www.zawya.com |



Post Your Comment