Contact us | +971 4 3635663
Sponsored by   Mudabala
 
 
BETA
Loading Loading ...
Sun, 22 Nov 2009 | 13:03 GMT
 

Bugatti Veyron 16.4 Grand Sport expands the Bugatti product range

Press Release
 
 

20 October 2008

Bugatti, the marque renowned for impeccable automotive solutions, aesthetics and driving dynamics will unveil a second model - the new Bugatti Veyron 16.4 Grand Sport with a unique removable roof.

Al Habtoor MotorsAl Habtoor MotorsLoading..., the exclusive sales and service agent of Bugatti Automobiles SAS in the United Arab Emirates launched the new Bugatti at an exclusive launch event featuring the crème de la crème of the motoring world at the Tee Lounge at the Four Seasons Golf Club, Dubai on the 15th October 2008.

In response to customer demand, significant modifications have been made to the vehicle's complex structure to make possible open-top driving, thereby adding a new dimension to this high-performance sports car. Incorporating a host of new and innovative safety and equipment features, it is the world's fastest and most exciting roadster. It is immediately recognizable as a result of its slightly higher windscreen, stylized daytime running lights, and lightweight, transparent polycarbonate roof.

The main challenge in developing the new Bugatti Veyron 16.4 Grand Sport with removable roof resulted from the unique structure of the fixed-roof Bugatti Veyron. An optimum combination of rigidity and lightweight engineering ensures the monocoque passenger cell of the original model is extremely strong while weighing an absolute minimum - it is a central element of the vehicle's structure. As the roof is an integral part of this, removing it meant the load paths had to be completely redesigned to maintain the vehicle's rigidity and crash safety, and to offer additional protection from side impacts and rolling.

As a result, the monocoque structure has been reinforced around the side skirts and the transmission tunnel. The B-pillars have been cross-stiffened using a carbon fibre support, and a central carbon plate has been positioned beneath the transmission tunnel to ensure the vehicle suffers from less torsional flexing than any other roadster.

The doors of the new Bugatti Veyron 16.4 Grand Sport are made of carbon fibre, and house an integrated longitudinal beam.

In the event of an accident, this transfers the load from the A to the B-pillar, thereby dissipating impact energy. Furthermore, the two redesigned air intakes for the 16-cylinder mid-engine now feature 10-centimetre wide carbon-fibre elements to offer protection should the car roll.

Along with moisture-resistant, backstitched leather, a range of new equipment features has been added to the interior, including a reversing camera with 2.7-inch monitor in the rear-view-mirror, and the "Puccini" sound system with digital signal processor.

When the roof is closed, the Bugatti Veyron 16.4 Grand Sport can reach 407 km/h, while speeds of up to 360 km/h are possible with roof off. Should it rain, an innovative folding roof stored in the luggage compartment can be opened up like an umbrella at any time. When this folding roof is in place, the car can travel at up to 130 km/h.

Assembled by hand at the company's headquarters in Molsheim, France, the Veyron 16.4 Grand Sport will be available from March 2009.

Just 150 examples will be made, with the first 50 of these going exclusively to registered Bugatti customers.

-Ends-

For more information, contact:
Al Habtoor Motors
Zeina Salibi
Marketing Manager
Tel: +971 4 294 4492
Fax:+971 4 294 4422
E-mail: zeina@bentleyemirates.ae

© Press Release 2008

from Advertising Marketing & Consultants
 
 
 
Community Comments (0) - Comment on this article
The opinions of the authors expressed herein do not necessarily state or reflect Zawya. Read our Comment Policy.
 
 
 
Loading ...
 
Report Abuse
Loading ...
 
 
Loading ...
Zawya Comment Policy:
 
  1. Zawya encourages you to add a comment to this discussion. You agree that when you add content to this discussion your comments will not:
    1.1   Contain any material which is libelous or defamatory of any person, is obscene, offensive, hateful or inflammatory or causes damage to the reputation of any person or organisation.
    1.2   Promote sexually explicit material, violence, discrimination based on race, sex, religion, nationality, disability, sexual orientation or age or any illegal activity.
    1.3   Be made in breach of any legal duty owed to a third party, such as a contractual duty or a duty of confidence.
    1.4   Be threatening, abuse or invade another's privacy, or cause annoyance, inconvenience or needless anxiety.
    1.5   Be used to impersonate any person, to misrepresent your identity or affiliation with any person, or be likely to deceive any person.
    1.6   Give the impression that they represent Zawya.
    1.7   Advocate, promote or assist any unlawful act such as (by way of example only) copyright infringement or computer misuse.
  2. The content posted on www.zawya.com is created by members of the public. The views expressed are theirs and unless specifically stated are not those of Zawya. Zawya reserves the right to review all comments prior to posting and edit or delete any contribution, but Zawya is not responsible for and can not be held liable for any content posted by members of the public on www.zawya.com.
  3. Zawya is not responsible for the availability or content of any third party sites that are accessible through www.zawya.com. Any links to third party websites from www.zawya.com do not amount to any endorsement of that site by Zawya and any use of that site by you is at your own risk.
  4. By submitting your comment, you hereby give Zawya the right, but not the obligation, to post, air, edit, exhibit, telecast, webcast, re-use, publish, reproduce, use, license, print, distribute or otherwise use your comments worldwide, in perpetuity.
 
 
 
 
 
 
 
Post Your Tender Notices for FREE
(No Sign-in Required)
 
 
Tender Notice Due Date
Supply of Vibration Measurement Instruments AA/09-10/M/191/S 21Dec09
Maintenance of Al Karana Sewage Lagoon AA/09-10/M/197/S 07Dec09
Replacement / Upsizing of Sewerline at Madinat Khalifa Area, Al Tadamon Street ِAA/09-10/M/196/S 23Nov09
Secondment of Professional Staff for Site Supervision and Consultancy Services for – Modification and Addition to Existing 36 Schools Around Doha and Villages BA/09-10/C/039/I 20Dec09
On Call Supply of G.I Pipes , Fitting & Hoses for Mechanical Workshop AA/09-10/M/147/I 27Dec09
Al Wakrah and Al Wukair Sewerage Scheme – House connections DA/HC/09-10/C/027/I 06Dec09
Supply, Delivery, Install, Testing and Commissioning of 3D Laser Scanners With Necessary Components, Accessories, Software, ON-Site Training and Warranty Support EBSD/09-10/N/007/I 22Nov09
Consultancy Service for Design, Development, Testing and Deployment of Integrated Qatar Design Enquiry system ( Q-DES) Including Q – PRO System Enhancements and Migration EBSD/09-10/N/002/I 13Dec09
Supply of Civil Material, Call – Off Contract AA/09-10/M/185/I 06Dec09
Post-Contract Professional Site Supervision and Quantity Surveying Consultancy Services for: Construction, Completion and Maintenance of Al Khor Park BA/09-10/S/024/I 06Dec09
Construction of Primary Health Care Centre at Al-Nuaim BA/09-10/C/011/G 12Jan10
Construction of Mosques, Imam Houses, ETC (Package 8) BA/09-10/C/019/G 22Dec09
Modification and Additions to Existing 36 NOS. Schools around Doha and Villages Package 1 (School No.11,12,19,30,31 &35) BA/09-10/C039/G 08Dec09
Rental of Light Vehicles and Drivers on a Regular & ‘Call-Off’ Basis GS/09-10/M/003/G 24Nov09
Development of Main Roads in Zone 46 RA/07-08/C/016/G 08Dec09
Road Improvement Works in Al Shamal Municipality- Zone( 76 to 79) RA/09-10/C/083/G 24Nov09
Road Improvement Works in Zone ( 56,57 ) and Doha South RA/09-10/C/086/G 24Nov09
Development of Roads In Block 1300 RA/09-10/C/081/G 08Dec09
Secondment of Professional staff -Quantity Surveyors, Planning/Cost Engineers, Business System Analysts, Project Management System Administrators and Document Controllers EBSD/09-10/N/003/G 08Dec09
Construction, Completion and Maintenance of al Khor Hospital Medical Training Center BA/09-10/C/003/G 24Nov09
 »  More Tenders
 
 
 
Community Buzz

Stories

Companies

Most viewed companies by Community in the last 24 hrs
Company Name Country Industry
Saudi Binladin Group Saudi Arabia Construction and Design
Consolidated Contractors Company Overseas Construction and Design
Saudi Telecom Saudi Arabia Telecommunications Services
Saudi Electricity Company Saudi Arabia Electric Utilities
Investment Corporation of Dubai UAE Investment Firms and Funds
Al Rajhi Bank Saudi Arabia Banking
Alokozay Group of Companies UAE Multi-line
Emirates Airline UAE Transportation Services
Saudi Basic Industries Corporation Saudi Arabia Petrochemicals
Almarai Company Saudi Arabia Food
 

Projects

Blogs

 
 

 
 
 
 
 

Site is optimised for viewing at 1024 x 768 with Internet Explorer v6 and Firefox v3.0 and above.
Copyright © 2009 ABQ Zawya Ltd. All rights reserved. Please read our Membership Agreement