Contact us | +971 4 3635663
Sponsored by   Mudabala
 
 
BETA
Loading Loading ...
Sat, 21 Nov 2009 | 07:41 GMT
 

World's first zero-watt monitors now shipping - without price hike

Press Release
 
 


Order books already bursting for eco-friendly monitors featuring zero-watt power save mode

Dubai, UAE, September 21, 2008 -The world's first monitors to feature power supplies that automatically switch off completely in power-save mode start shipping today. Developed in-house by Fujitsu Siemens ComputersFujitsu Siemens ComputersLoading..., the leading European IT provider, the revolutionary new power-saving technology goes on sale in the SCENICVIEW Premium Line ECO range.

Since Fujitsu Siemens ComputersFujitsu Siemens ComputersLoading... announced the zero-watt monitor concept, advance orders running into the thousands have been received from customers across the EMEA region. The first zero-watt monitors are now coming to market as scheduled.

Patent-pending zero-watt power save technology means the new SCENICVIEW ECO monitors draw no power when not in use - as the DC power converter shuts down completely. This is a first, because monitors in standby mode normally continue to draw between one and six watts of power. The Eco mode is enabled by default. The display includes a switching element in the power supply, controlled by the PC. When the monitor powers down, it triggers the power supply to totally disconnect from the mains. When the PC next sends output to the monitor, a small electrical pulse restores display power. This function works with analogue and digital monitor outputs.

Reducing European Union-wide power consumption through the adoption of electrical goods that use zero watts in standby mode would save an estimated 35 Terawatt hours per year according to the German Federal Institute for Materials Research and Testing (Bundesanstalt für Materialforschung)* - while the EU Stand-by Initiative reports estimates that stand-by power accounts for about 10 percent of the electricity use in homes and offices of the EU Member States**.

"When it comes to electricity demand management, small changes quickly add up," said James Governor, Principal Analyst at RedMonk, "So it's great to see Fujitsu Siemens ComputersFujitsu Siemens ComputersLoading... create a monitor that consumes no power when it's not in use."

Both new Fujitsu Siemens Computers SCENICVIEW ECO monitors - the 20-inch P20W-5 ECO and the 22-inch P22W-5 ECO - are Premium Line models, meaning that they are feature-packed in addition to their green credentials. Both monitors ship with an enhanced ergonomics stand, providing users with unrivalled levels of control over the height of the monitor, which can even be lowered almost to desk level.

The ECO monitors also introduce DisplayView AutoBright functionality, an automatic brightness control that adapts monitor brightness in harmony with ambient light, offering power savings during operations of up to an additional 30 percent as well as reducing eye strain. When maximum brightness is needed, the new units pump out an impressive 300 cd/m2.

With graphics capabilities of up to 1680 x 1050 pixels, the new ECO monitors do not scrimp on display sizes, either - while a 5 millisecond response time ensures crisp, sharp graphics and no screen artefacts. Thanks to HDMI interface support, the screens are also ideal for working with high-definition graphics.

In September, two more models will join the zero-watt monitor line-up: the 24-inch and 26-inch models.

Dr Joseph Reger, Chief Technology Officer at Fujitsu Siemens ComputersFujitsu Siemens ComputersLoading..., played a key role in the development of the new zero-watt technology, and comments: "Over the last year we have heard a lot of 'greenwash': unsubstantiated marketing claims about how new IT products are doing their bit to protect the environment. Today, with the introduction of these two new monitors, Fujitsu Siemens ComputersFujitsu Siemens ComputersLoading... is doing more than just talking about Green IT. We are delivering products that are truly greener than any other monitor on the market, bar none - both in standby mode AND in operation - and without a price premium, too.

"The overwhelming amount of public interest in - and pre-orders for - this range of monitors shows that there is pent-up public demand for IT products that are truly eco-friendly," adds Dr Reger. "The fantastic consumer response inspires us as we develop further products under the Green IT design philosophy."

The SCENICVIEW ECO model monitors are available to order immediately, in all countries across EMEA. Prices start at EUR 419 for the 20-inch model.

-Ends-

About Fujitsu Siemens ComputersFujitsu Siemens ComputersLoading...:
Fujitsu Siemens ComputersFujitsu Siemens ComputersLoading... is the leading European IT Infrastructure Provider with a strategic focus on next-generation Mobility and Dynamic Data Center products, services and solutions. With a platform and services portfolio of exceptional depth, our offering extends from notebooks through desktops to enterprise-class IT infrastructure solutions and services offerings. Fujitsu Siemens ComputersFujitsu Siemens ComputersLoading... has a presence in all key markets across Europe, the Middle East and Africa, with Infrastructure Services extending coverage approximately 170 countries worldwide. Leveraging the strengths, innovation and global reach of our joint shareholders, Fujitsu Limited and Siemens AG, we make sure we meet the needs of customers: large corporations, small and medium enterprises and private users. The company is a pioneer in providing environmentally conscious technology and processes, throughout the lifecycle of each product, and is a member of the Climate Savers Computing Initiative and Green Grid organizations. To meet stringent international standards for corporate social responsibility, Fujitsu Siemens ComputersFujitsu Siemens ComputersLoading... is a member of the United Nations Global Compact.

For more information on Fujitsu Siemens ComputersFujitsu Siemens ComputersLoading..., please visit: www.fujitsu-siemens.com, for Corporate Social Responsibility please see www.fujitsu-siemens.com/aboutus/sor/index.html.

Picture material is available at: http://www.fsc-mediaserver.com/ms/go.cfm?itemid=25496&jumpfactor=6

* BAM, http://www.bam.de/

** Source: EU Stand-by Initiative, http://re.jrc.ec.europa.eu/energyefficiency/html/standby_initiative.htm

PR Contacts
Amber Dale
The Portsmouth Group
Tel:- +971 4 369 3574
Fax: +971 4 360 4511
Email: amber.dale@theportsmouthgroup.com

© Press Release 2008

from The Portsmouth Group
 
 
 
Community Comments (0) - Comment on this article
The opinions of the authors expressed herein do not necessarily state or reflect Zawya. Read our Comment Policy.
 
 
 
Loading ...
 
Report Abuse
Loading ...
 
 
Loading ...
Zawya Comment Policy:
 
  1. Zawya encourages you to add a comment to this discussion. You agree that when you add content to this discussion your comments will not:
    1.1   Contain any material which is libelous or defamatory of any person, is obscene, offensive, hateful or inflammatory or causes damage to the reputation of any person or organisation.
    1.2   Promote sexually explicit material, violence, discrimination based on race, sex, religion, nationality, disability, sexual orientation or age or any illegal activity.
    1.3   Be made in breach of any legal duty owed to a third party, such as a contractual duty or a duty of confidence.
    1.4   Be threatening, abuse or invade another's privacy, or cause annoyance, inconvenience or needless anxiety.
    1.5   Be used to impersonate any person, to misrepresent your identity or affiliation with any person, or be likely to deceive any person.
    1.6   Give the impression that they represent Zawya.
    1.7   Advocate, promote or assist any unlawful act such as (by way of example only) copyright infringement or computer misuse.
  2. The content posted on www.zawya.com is created by members of the public. The views expressed are theirs and unless specifically stated are not those of Zawya. Zawya reserves the right to review all comments prior to posting and edit or delete any contribution, but Zawya is not responsible for and can not be held liable for any content posted by members of the public on www.zawya.com.
  3. Zawya is not responsible for the availability or content of any third party sites that are accessible through www.zawya.com. Any links to third party websites from www.zawya.com do not amount to any endorsement of that site by Zawya and any use of that site by you is at your own risk.
  4. By submitting your comment, you hereby give Zawya the right, but not the obligation, to post, air, edit, exhibit, telecast, webcast, re-use, publish, reproduce, use, license, print, distribute or otherwise use your comments worldwide, in perpetuity.
 
 
 
 
 
 
 
Post Your Tender Notices for FREE
(No Sign-in Required)
 
 
Tender Notice Due Date
Supply of Vibration Measurement Instruments AA/09-10/M/191/S 21Dec09
Maintenance of Al Karana Sewage Lagoon AA/09-10/M/197/S 07Dec09
Replacement / Upsizing of Sewerline at Madinat Khalifa Area, Al Tadamon Street ِAA/09-10/M/196/S 23Nov09
Secondment of Professional Staff for Site Supervision and Consultancy Services for – Modification and Addition to Existing 36 Schools Around Doha and Villages BA/09-10/C/039/I 20Dec09
On Call Supply of G.I Pipes , Fitting & Hoses for Mechanical Workshop AA/09-10/M/147/I 27Dec09
Al Wakrah and Al Wukair Sewerage Scheme – House connections DA/HC/09-10/C/027/I 06Dec09
Supply, Delivery, Install, Testing and Commissioning of 3D Laser Scanners With Necessary Components, Accessories, Software, ON-Site Training and Warranty Support EBSD/09-10/N/007/I 22Nov09
Consultancy Service for Design, Development, Testing and Deployment of Integrated Qatar Design Enquiry system ( Q-DES) Including Q – PRO System Enhancements and Migration EBSD/09-10/N/002/I 13Dec09
Supply of Civil Material, Call – Off Contract AA/09-10/M/185/I 06Dec09
Post-Contract Professional Site Supervision and Quantity Surveying Consultancy Services for: Construction, Completion and Maintenance of Al Khor Park BA/09-10/S/024/I 06Dec09
Construction of Primary Health Care Centre at Al-Nuaim BA/09-10/C/011/G 12Jan10
Construction of Mosques, Imam Houses, ETC (Package 8) BA/09-10/C/019/G 22Dec09
Modification and Additions to Existing 36 NOS. Schools around Doha and Villages Package 1 (School No.11,12,19,30,31 &35) BA/09-10/C039/G 08Dec09
Rental of Light Vehicles and Drivers on a Regular & ‘Call-Off’ Basis GS/09-10/M/003/G 24Nov09
Development of Main Roads in Zone 46 RA/07-08/C/016/G 08Dec09
Road Improvement Works in Al Shamal Municipality- Zone( 76 to 79) RA/09-10/C/083/G 24Nov09
Road Improvement Works in Zone ( 56,57 ) and Doha South RA/09-10/C/086/G 24Nov09
Development of Roads In Block 1300 RA/09-10/C/081/G 08Dec09
Secondment of Professional staff -Quantity Surveyors, Planning/Cost Engineers, Business System Analysts, Project Management System Administrators and Document Controllers EBSD/09-10/N/003/G 08Dec09
Construction, Completion and Maintenance of al Khor Hospital Medical Training Center BA/09-10/C/003/G 24Nov09
 »  More Tenders
 
 
 
Community Buzz

Stories

Companies

Most viewed companies by Community in the last 24 hrs
Company Name Country Industry
Consolidated Contractors Company Overseas Construction and Design
Saudi Binladin Group Saudi Arabia Construction and Design
Dodsal Engineering and Construction UAE Construction and Design
Saudi Electricity Company Saudi Arabia Electric Utilities
Saudi Telecom Saudi Arabia Telecommunications Services
Emirates Telecommunications Corporation UAE Telecommunications Services
Agility Public Warehousing Company Kuwait Transportation Services
Al Azizia Panda United Company Saudi Arabia General Retailers
Al Maktoum International Airport UAE Transportation Services
Emirates Airline UAE Transportation Services
 

Projects

Blogs

 
 

 
 
 
 
 

Site is optimised for viewing at 1024 x 768 with Internet Explorer v6 and Firefox v3.0 and above.
Copyright © 2009 ABQ Zawya Ltd. All rights reserved. Please read our Membership Agreement