Dijla Petroleum Company - Khurbet East Oil Field CPF
Country : Syria
Project Value : USD 129,000,000
Sector : Oil and Gas | Processing & Separation
Contractor : Saipem (EPC)
Profile Type :  Standalone Project
Phase:
EPC - Execution
Completion: Dec 2012
 
 
Owner : Dijla Petroleum Company
Shareholders : Gulfsands Petroleum - Syria
Syrian Petroleum CompanySyrian Petroleum CompanyLoading... - Syria
Location :
Syria
Contract Type : EPC - Engineering, Procurement, Construction
Payment Terms : Lump Sum Turnkey (LSTK)
Facility Type : Central processing facility
Capacity : 50,000 bpd of fluids
Background Dijla Petroleum Company plans to construct a Central Processing Facility (CPF) in Khurbet East Oil field, block 26.

The project aims at processing 50,000 bpd of fluids of which it is initially expected to produce 33,000 bpd and increase production gradually.
Expected Events
Schedule Contract Phase/Phase Description
Jun 2011 EPCConstruction expected to start
Dec 2012 CompletionProject expected to be completed
Latest Events In December 2011, construction of the CPF was ongoing.

In December 2012, the project is expected to be completed
Previous Events In June 2011, construction of the CPF started.

In February 2011, engineering works were ongoing.

In January 2011, detailed design and engineering works started.

In December 2010, the EPC contract was officially signed with SaipemSaipemLoading....

On 15 November 2010, the EPC contract was awarded to SaipemSaipemLoading....
Scope of Work Construction of a central processing facility with a production capacity of 50,000 bpd of fluids.

Project Schedule

ScheduleContract Phase/PhaseDescription
15 Nov 2010 EPCContract awarded to SaipemSaipemLoading...
Dec 2010 EPCContract officially signed between SaipemSaipemLoading... and Dijla Petroleum
Jan 2011 EPCEngineering works started
Jun 2011 EPCConstruction expected to start
Dec 2012 CompletionProject expected to be completed
 
Dijla Petroleum Company
Owner 
653 Building, 1st floor, Sahnaya Highway, Ashrafet Sahnaya, P.O. Box 81, Damascus, Syria Tel: +963 1-1668-01000 | Website: http://www.dijlapetroleum.com/
 
Saipem
Contractor - EPC
Via Martiri di Cefalonia Street, San Donato Milanese, Milan 20097, Italy Tel: +39 02-5201 | Fax: +39 02-5204-4415 | Email: info@saipem.com | Website: http://www.saipem.com
  • Name: Sapio Bonricino
    Position: Project Manager
    Tel: +974 4-448-6100
 
Gulfsands Petroleum
Shareholder 
653 Building, 1st floor, Sahnaya Highway, Ashrafet Sahnaya, P.O. Box 81, Damascus, Syria
Tel: +963 1-1668-01000 | Email: info@gulfsands.com | Website: www.gulfsands.com
 
Syrian Petroleum Company Building, Al Mughtaribeen Street, Dummar Province Expansion Square Area, P.O. Box 2849, Damascus, Syria, Damascus
Tel: +963 11-313-7935,+963 11-313-7913 | Fax: +963 11-313-7979,+963 11-313-7977 | Email: spccom1@scs-net.org,spccom2@scs-net.org | Website: http://www.spc-sy.com
Print
 
  • SEARCH MIDDLE EAST PROJECTS
 
 
 
 
Panel