| Country |
: |
Qatar |
| Project Value |
: |
USD 4,000,000,000 |
| Sector |
: |
Infrastructure | Ports |
|
Consultants |
: |
Royal Haskoning
(Master Plan) |
Scott Wilson Kirkpatrick and Company Middle East
(Conceptual design) |
COWI A/S Qatar
(Technical) |
WorleyParsons Engineering
(Detailed design) |
|
PMC |
: |
AECOM
|
|
Contractor |
: |
China Harbour Engineering Arabia Company Limited
(Construction) |
| Profile Type |
: |
Contract Project
|
| Associated Projects |
: |
Contract (1) |
|
Phase: Construction - Execution
|
|
Completion: Q3 2015
|
|
|
|
| Owner |
: |
The New Doha Port Steering Committee
|
| Location |
: |
Al Wakra, Doha, Qatar
|
| Contract Type |
: |
Construction |
| Facility Type |
: |
Port |
| Capacity |
: |
2 million TEUs 2 million t of cargo per year |
|
| Background |
The New Doha Port Steering Committee plans to develop phase 1 of the New Doha Port, which is located in Economic Zone number 3, Al Wakrah, south of Mesaieed area. Phase 1 includes excavation, dredging works, a harbor basin, general cargo berths and emiri yachts. It will have a capacity of 2 million 20-foot equivalent units per year. The New Doha port will be developed in 3 phases. Phase 2 will include a container terminal and an extension to the harbor basin. Phase 3 will include a container terminal, berths, an administration and customs complex and a tug and pilot boats berth area.The new port will be linked to the mainland by an 8.5 km long trestle bridge. Upon completion, the new port will have a capacity of 6 million 20-foot equivalent units per year. Scott Wilson Group is the conceptual design consultant. Worley ParsonsWorley Parsons is the detailed design consultant. Royal Haskoning is the master plan consultant. COWICOWI is the technical consultant. AECOMAECOM is the PMC. |
| Expected Events |
| Schedule |
Contract Phase/Phase |
Description |
| Q3 2015 |
Completion | Project expected to be completed
|
|
| Latest Events |
In March 2012, the construction of the port was ongoing. In Q3 2015, the project is expected to be completed. |
| Previous Events |
In March 2011, construction of the port started. On 13 March 2011, the construction contract was signed with China Harbour Engineering Arabia CompanyChina Harbour Engineering Arabia Company . In January 2011, the construction contract was awarded to China Harbour Engineering Arabia CompanyChina Harbour Engineering Arabia Company . On 18 April 2010, the bids for the construction contract were submitted. China Harbour Engineering Arabia CompanyChina Harbour Engineering Arabia Company submitted the lowest bid (USD 8.46 million). In October 2009, the ITB for the construction contract was issued. In May 2009, the prequalification for the construction contract was issued. In January 2009, the ITB for the dredging contract of phase 1 was issued. In November 2008, the PMC contract was awarded to AECOMAECOM . |
| Scope of Work |
Development of a port including: - Excavation. the 58 million cu.m. excavated material will be used to build 8 km of quay wall and a 5 km long breakwater - Dredging a sea channel that will link to the existing sea channel for Messaeid industrial city - A 2 million TEUs container terminal - A 15 m deep approach channel to the port - An 8 to 13.5 m deep harbor basin - General cargo berths - Emiri yachts |