Takreer - Ruwais Refinery Expansion - Non-Process Buildings
Country : UAE
Project Value : USD 100,000,000
Sector : Oil and Gas | Offsites & Utilities
Consultants : Foster Wheeler International (Feasibility Study) |  Bechtel Corporation (FEED)
PMC : Fluor Mideast Limited (Overseeing FEED)
Contractor : Ed Zueblin (EPC)
Profile Type :  Contract Project
Associated Projects : Contract (6)
Phase:
EPC - Execution
Completion: Jun 2013
 
 
Owner : Abu Dhabi Oil Refining CompanyAbu Dhabi Oil Refining CompanyLoading... - UAE
Location :
Ruwais, Abu Dhabi, UAE
Contract Type : EPC - Engineering, Procurement, Construction
Facility Type : Residence and offices
Capacity : 18 buildings 
Offices over 25,000 - 30,000 sq.m. area
Background Abu Dhabi Oil Refining Company (Takreer)Abu Dhabi Oil Refining Company (Takreer)Loading... plans to construct buildings and offices to serve Takreer's grassroots refinery in Ruwais.

Foster WheelerFoster WheelerLoading... is the overall feasibility study consultant.

Fluor CorporationFluor CorporationLoading... is the PMC overseeing FEED studies.

BechtelBechtelLoading... is the FEED study consultant.
Expected Events
Schedule Contract Phase/Phase Description
Jun 2013 CompletionProject expected to be completed
Latest Events In January 2012, construction works were in progress.

In June 2013, the project is expected to be completed.
Previous Events In January 2011, construction of the buildings started.

In June 2010, site preparation and engineering works started.

In May 2010, the EPC contract was awarded to Ed Zueblin.

In August 2009, the FEED study was completed.

In January 2008, the FEED study contract was awarded to BechtelBechtelLoading....

In November 2007, the PMC overseeing the FEED study contract was awarded to Fluor CorporationFluor CorporationLoading....

In May 2007, the ITB for the PMC overseeing the FEED study was issued.

In August 2006, the feasibility study contract was awarded to Foster WheelerFoster WheelerLoading....
Scope of Work Construction of buildings and offices including:

- 18 buildings to house utilities
- Substations
- District cooling tower
- Warehouses
- Health and safety offices over 25,000 - 30,000 sq.m. area
Contract Packages
Type Project Name Contract Value
Takreer - Ruwais Refinery Expansion USD 10,000,000,000
Takreer - Ruwais Refinery Expansion - Marine Package USD 270,000,000
Takreer - Ruwais Refinery Expansion - Crude Distillation Units Package USD 2,100,000,000
Takreer - Ruwais Refinery Expansion - Dredging Package USD 346,000,000
Takreer - Ruwais Refinery Expansion - Fluid Cracking Unit Package USD 3,100,000,000
Takreer - Ruwais Refinery Expansion - Offsites and Utilities Package USD 2,730,000,000
Takreer - Ruwais Refinery Expansion - Tank Farm Package USD 1,300,000,000

Project Schedule

ScheduleContract Phase/PhaseDescription
Aug 2006 StudyFeasibility study contract awarded to Foster WheelerFoster WheelerLoading...
May 2007 PMCITB issued for PMC overseeing the FEED study
Jun 2007 FEEDITB issued
Nov 2007 PMCContract overseeing the FEED study awarded to Fluor CorporationFluor CorporationLoading...
Q4 2007 FEEDBidders submitted their proposals
Jan 2008 FEEDContract awarded to BechtelBechtelLoading...
Aug 2009 FEEDStudy completed
May 2010 EPCContract awarded to Ed Zueblin
Jun 2010 EPCSite preparations and engineering works started
Jan 2011 EPCConstrcution works started
Jun 2013 CompletionProject expected to be completed
 
Al Khalifa Energy Complex, 11th-25th Floor, Khalifa Street, Corniche Area, P.O. Box 3593, Abu Dhabi, United Arab Emirates, Abu Dhabi
Tel: +971 2-602-7000 | Fax: +971 2-602-7001 | Email: publicrelations@takreer.com | Website: http://www.takreer.com
  • Name: Mohammed Yabouni
    Position: Engineering and Projects Division Manager
    Tel: +971 2-602-7391
    Fax: +971 2-602-7400
 
Bechtel Corporation
Consultant - FEED
H.E. Sh. Sultan Bin Surour Al Dhahiri Building, 15th floor, Al Salam Street, Abu Dhabi, Abu Dhabi, UAE
Tel: +971 2-699-8400 | Fax: +971 2-676-0899
 
Foster Wheeler International
Consultant - Feasibility Study
Bugatti Building, 1st floor, Al Corniche Street, Abu Dhabi, P.O. Box 26702, Abu Dhabi, UAE Tel: +971 2-622-2117 | Fax: +971 2-622-2119 | Website: http://www.fwc.com/
  • Name: David Macmahon
    Position: Project Manager
    Tel: +44 118-913-1234 ext:8767
 
Ed Zueblin
Contractor - EPC
Al Otaiba Tower, 8th floor, Electra Street, Abu Dhabi, P.O. Box 28708, Abu Dhabi, UAE
Tel: +971 2-632-8078; +971 2-634-9583 | Fax: +971 2-362-9704 | Email: zublin@emirates.net.ae | Website: http://www.zueblin-international.com
 
Fluor Mideast Limited
PMC - Overseeing FEED
Al Obaidly Tower 5, 1st, 2nd, 14th and 15th Floor, Al Istiqlal Street, Khalidiya Area, P.O. Box 46858, Abu Dhabi, United Arab Emirates, Abu Dhabi
Tel: +971 2-617-2700 | Fax: +971 2-631-1660
  • Name: Jack Bielman
    Position: Contracts Director
    Tel: +965 325-2001
    +965 325-2401
    +965 325-2402
    Fax: +965 326-1043
    Email jack.bielman@fluor.com
Key:    Master Project    Package Project    Contract Project