Aramco/ConocoPhillips - Yanbu Export Refinery
Country : Saudi Arabia
Project Value : USD 12,000,000,000 Estimated
Sector : Oil and Gas | Refinery
Consultant : KBR
PMC : KBR
Profile Type :  Master Project  | Related Projects (7)
Phase:
EPC - Bid Submission
Completion: Q3 2014
 
 
Owner : JV of Aramco and ConocoPhillips
Shareholders : Saudi Arabian Oil CompanySaudi Arabian Oil CompanyLoading... - Saudi Arabia - 50.00 %
ConocoPhillips Middle East and North AfricaConocoPhillips Middle East and North AfricaLoading... - United States - 50.00 %
Location :
Yanbu Industrial City 1, Yanbu, Western Province, Saudi Arabia
Contract Type : EPC - Engineering, Procurement, Construction
Payment Terms : Lump Sum Turnkey (LSTK)
Facility Type : Refinery
Capacity : 400,000 bpd of Arabian heavy crude
Background The joint venture of Saudi AramcoSaudi AramcoLoading... and ConocoPhillipsConocoPhillipsLoading... plans to develop Yanbu Export Refinery.

Saudi AramcoSaudi AramcoLoading... will supply the crude. The refinery will produce motor fuels and other refined products for the US and European markets.

The project will be divided into 11 main packages: 4 main processing packages, and 7 other specialty packages.

Saudi AramcoSaudi AramcoLoading... and ConocoPhillipsConocoPhillipsLoading... will each be responsible for marketing one half of the refinery's output.

KBRKBRLoading... is the program management services contractor and FEED consultant.
Current Status In November 2009, 4 long-lead equipment supply contracts worth USD500 million are expected to be awarded. The contracts cover: a coke drum (preferred bidder is Sumitomo Heavy Industries), a hydrocracker reactor (preferred bidder is Japan Steel Works), a compressor and turbine driver (preferred bidder is GE), and a distributed control system (preferred bidder is Yokogawa Corporation).

31 January 2010 is the bids submission deadline for all EPC contracts.

In Q2 2010, the remaining contracts are expected to be awarded.

In Q3 2014, the project is expected to be completed. The project was previously expected to be completed in 2012.
Previous Events In June 2009, ITB was re-issued for 6 EPC contracts.

In April 2009, contractors submitted their pre-qualification applications for several EPC packages.

On 6 November 2008, Aramco and ConocoPhillipsConocoPhillipsLoading... announced that they decided to halt the bidding process.

13 December 2008 was the initial deadline for the commercial and technical bids submission for the main packages (the deadline was previously delayed from 3 November 2008).

In July 2008, the ITB for the main packages was issued.

In June 2008, the FEED study was completed.

In May 2008, Saudi AramcoSaudi AramcoLoading... and ConocoPhillipsConocoPhillipsLoading... announced the approval of continued funding for the development.

In May 2006, Saudi AramcoSaudi AramcoLoading... and ConocoPhillipsConocoPhillipsLoading... signed the MoU.
Scope of Work Construction of:

Package 1:
Coker Package:
- Delayed Coker Unit (DCU)
- Unsaturated Gas Plant (UGP)
- Mercaptan Removal Unit (MRU)

Package 2:
Crude Block Package:
- Crude Distillation Unit (CDU)
- Vacuum Distillation Unit (VDU)
- Saturated Gas Plant (SGP)

Package 3:
Gasoline Distiller Package:
- Distillate Hydrotreater (DHT)
- Continuous Catalytic Reformer (CCR)
- Naphtha Hydrotreater (NHD)
- Benzene Extractor Unit (BEU)
- Isomerisation Unit (ISM)

Package 4:
Hydrocraker Package
- Hydrocracker

Specialty packages include: tank farm, offsites and utilities, solids handling, offsite pipelines, electrical work, and interconnection work.
Financing Source In 2009, an investment decisions regarding the project are expected to be made.

In August 2006, Citigroup and Riyad Bank were awarded the advisory mandate.
Expected Schedule
PhaseScheduleDescription
EPC 31 Jan 2010 Bidders expected to submit their proposals for all packages
Completion Q3 2014 Project expected to be completed
Related Projects
Type Project Name Contract Value
Aramco/ConocoPhillips - Yanbu Export Refinery - Coker Package (Package 1) USD 1,200,000,000
Aramco/ConocoPhillips - Yanbu Export Refinery - Crude Block Package (Package 2) USD 970,000,000
Aramco/ConocoPhillips - Yanbu Export Refinery - Gasoline Distiller Package (Package 3) USD 2,300,000,000
Aramco/ConocoPhillips - Yanbu Export Refinery - Hydrocracker Package (Package 4 ) USD 1,200,000,000
Aramco/ConocoPhillips - Yanbu Export Refinery - Offsites and Utilities Package USD 1,500,000,000
Aramco/ConocoPhillips - Yanbu Export Refinery - Solids Handling Package USD 450,000,000
Aramco/ConocoPhillips - Yanbu Export Refinery - Tank Farm USD 900,000,000

Project Schedule

SchedulePhaseDescription
May 2006 Planning Aramco and ConoccoPhilips signed a MoU
Aug 2006 FEED Contract awarded to KBRKBRLoading...
Jun 2008 FEED FEED completed
Jul 2008 EPC ITB for the main packages issued
03 Nov 2008 EPC Initial deadline for commercial and technical bids submission
13 Dec 2008 EPC Delayed deadline for commercial and technical bids submission
Apr 2009 EPC Bidders submitted their prequalification applications for several packages
Jun 2009 EPC ITB was re-issued for the 6 main packages
31 Jan 2010 EPC Bidders expected to submit their proposals for all packages
Q3 2014 Completion Project expected to be completed

Project News

20-Jul-2009 Saudi to boost refining capacity by 1.6m bpd - Emirates Business 24/7
01-Jul-2009 Aramco, Conoco Relaunch Bidding On Yanbu Refinery - Zawya Dow Jones News
13-Apr-2009 Saudi Aramco Looks To Implement PETRORabigh II Amid Downstream Go-Slow - MEES
16-Mar-2009 Saudi Aramco, Total, Conoco Invite Bids For Refinery Projs - Zawya Dow Jones News
22-Nov-2008 Saudi Aramco To Review Contracts On Lower Prices - Report - Zawya Dow Jones News
07-Nov-2008 Oil alliance halts bid for refinery - Financial Times
27-Oct-2008 Saudi Refinery Plans Not Impacted By Financial Crisis - MEES
21-Jul-2008 Saudi Aramco Moves Ahead On Yanbu? Downstream Project With ConocoPhillips - MEES
17-May-2008 Saudi Aramco and ConocoPhillips Confirm Yanbu Export Refinery Project - Saudi Press Agency
24-May-2006 Saudi Aramco, ConocoPhillips Sign Yanbu’ Refinery Pact - Saudi Press Agency
» More News
 
JV of Aramco and ConocoPhillips
Owner 
  • Name: Mahdi Asfour
    Position: Project Director
    Tel: +966 3-862-5255
 
KBR
Consultant 
P. O. Box: 3474, Al Khobar 31952, Saudi Arabia
Tel: +966 3-858-8877, 966 3-887-2175 | Fax: +966 3-873-0176 | Website: www.kbr.com
 
KBR
PMC 
P. O. Box: 3474, Al Khobar 31952, Saudi Arabia
Tel: +966 3-858-8877, 966 3-887-2175 | Fax: +966 3-873-0176 | Website: www.kbr.com
 
ConocoPhillips
Shareholder 
600 North Dairy Ashford (77079-1175), P.O. Box 2197, Houston, TX 77252-2197,
Tel: +1 281-293-1000
  • Name: Nick Spencer
    Position: General Manager
 
Saudi Arabian Oil Company Building, P.O. Box 5000, Dhahran 31311, 31311, Saudi Arabia
Tel: +966 3-872-0115 | Fax: +966 3-873-8190 | Email: webmaster@aramco.com.sa | Website: http://www.saudiaramco.com
  • Name: Abdul Hamid Al Hatlani
    Position: Business Manager
    Tel: +966 3-874-1755
Key:    Master Project    Contract Package
Print
 
  • SEARCH MIDDLE EAST PROJECTS
 
 
 
 
 
 
 
 

Site is optimised for viewing at 1024 x 768 with Internet Explorer v6 and Firefox v3.0 and above.
Copyright © 2009 ABQ Zawya Ltd. All rights reserved. Please read our Membership Agreement