Takreer - Ruwais Refinery Expansion
Country : UAE
Project Value : USD 10,000,000,000 Estimated
Sector : Oil and Gas | Refinery
Consultants : UOP Middle East (Technology and Engineering Services) |  Foster Wheeler International (Feasibility Study) |  Bechtel Corporation (FEED) |  Shaw International Limited (Proprietary Technology )
PMC : Fluor Mideast Limited (Overseeing FEED)
Profile Type :  Master Project
Associated Projects : Contract Package (7)
Phase:
EPC - Execution
Completion: 2013
 
 
Owner : Abu Dhabi Oil Refining CompanyAbu Dhabi Oil Refining CompanyLoading... - UAE
Location :
Ruwais, Abu Dhabi, UAE
Contract Type : EPC - Engineering, Procurement, Construction
Payment Terms : Lump Sum Turnkey (LSTK)
Facility Type : Refinery and aromatics complex
Capacity : 400,000 bpd
Background Abu Dhabi Oil Refining Company (Takreer)Abu Dhabi Oil Refining Company (Takreer)Loading... plans to construct a grassroots refinery alongside its existing refinery in Ruwais.

The expansion project will increase the Ruwais refining capacity by 400,000 bpd.

The refinery will produce unleaded gasoline, naphtha, aviation turbine fuel, liquefied petroleum gas (LPG), kerosene, gas-oil, bunker fuel and other hydrocarbon derivatives. The project will also include a cracker unit with a capacity of 127,100 bpd.

The project will be developed in 8 packages including: crude distillation and sulfur recovery facilities, a residue fluidized catalytic cracker, offsites and utilities, storage tanks, infrastructure work, marine works, and two separate packages for the site preparation works for the northern and southern areas.

Shaw Group is the refining technology provider.

CBI Lummus is the cracking and olefins conversion technology provider.

UOP is the hydro-processing technology provider.

Foster WheelerFoster WheelerLoading... is the feasibility study consultant.

Fluor CorporationFluor CorporationLoading... is the PMC for FEED.

BechtelBechtelLoading... is the FEED consultant.
Expected Events
Schedule Contract Phase/Phase Description
2013 CompletionProject expected to be completed
Latest Events In January 2012, all packages were under construction.

In 2013, the project is expected to be completed.
Previous Events In May 2011, all packages were under construction.

In November 2010, the project was under execution.

In May 2010, the EPC contract for the non-process buildings package was awarded to Ed Zueblin.

In November 2009, five packages were awarded. The marine and the fluid cracking unit packages were awarded to GS Engineering and Construction, the crude distillation units package was awarded to SK Engineering and Construction, the tank farm package was awarded to Daewoo Engineering and Construction and the offsites and utilities package was awarded to Samsung Engineering and Construction.

In August 2009, the FEED study was completed.

On 7 June 2009, dredging works started.

In May 2009, the EPC contract for the dredging package was awarded to Dredging International.

In September 2008, the technology and engineering services contract was awarded to UOP (subsidiary of Honeywell Company).

In August 2008, the proprietary technology contract was awarded to Shaw Group.

In January 2008, the FEED study contract was awarded to BechtelBechtelLoading....

In November 2007, the PMC contract overseeing the FEED study was awarded to Fluor CorporationFluor CorporationLoading....

In Q4 2007, bids for the FEED study contract were submitted.

In June 2007, the ITB for the FEED contract was issued.

In May 2007, the ITB for the PMC contract overseeing the FEED study was issued.

In August 2006, the feasibility study contract was awarded to Foster WheelerFoster WheelerLoading....
Scope of Work Construction of a grassroots refinery and aromatics complex including:

Tank Farm Package:
- 3 crude oil tanks (477,000 cu.m.)
- 27 intermediate storage tanks (584,000 cu.m.)
- 25 storage tanks for refined products (2.4 million cu.m.)
- 9 storage tanks for LPG and mixed butane (59,000 cu.m.)
- 3 refrigerated storage tanks for propylene (174,000 cu.m.)

Marine Package:
- A jetty
- Loading and unloading facilities
- Associated pipelines

Dredging Package:
- Dredging and pumping 42 million cu.m of material
- Reclamation works
- Heavy-duty cutter suction dredgers
- Trailing suction hopper dredgers
- Booster stations
- Spreader pontoons

Non-Process Buildings:
- 18 buildings to house utilities
- Substations
- District cooling tower
- Warehouses
- Health and safety offices over 25,000 - 30,000 sq.m area

Offsites and Utilities Package:
- A sour water stripper
- Waste-water treatment facilities
- Nitrogen production units
- A steam condensate recovery unit
- Steam generation units
- Electrical distribution systems
- Integrated control systems

Fluid Cracking Unit and Crude Distillation Units packages
Contract Packages
Type Project Name Contract Value
Takreer - Ruwais Refinery Expansion - Marine Package USD 270,000,000
Takreer - Ruwais Refinery Expansion - Crude Distillation Units Package USD 2,100,000,000
Takreer - Ruwais Refinery Expansion - Dredging Package USD 346,000,000
Takreer - Ruwais Refinery Expansion - Fluid Cracking Unit Package USD 3,100,000,000
Takreer - Ruwais Refinery Expansion - Non-Process Buildings USD 100,000,000
Takreer - Ruwais Refinery Expansion - Offsites and Utilities Package USD 2,730,000,000
Takreer - Ruwais Refinery Expansion - Tank Farm Package USD 1,300,000,000
Project News
10-May-2011 Ruwais refinery expansion on track - Gulf News
04-Nov-2010 Takreer pursues $10b expansion - Gulf News
08-Aug-2010 MESC wins $14 million order for Ruwais Refinery Expansion - Press Release
25-Mar-2009 Ruwais Refinery Project Bidding in June - Khaleej Times
11-Dec-2008 UAE to upgrade two refineries by 2011 - Gulf News
06-Aug-2008 FEED study of Takreer refinery expansion to be ready by next year - Khaleej Times
31-Aug-2006 Foster Wheeler awarded UAE refinery feasibility studies by TAKREER - Press Release
» More News

Project Schedule

ScheduleContract Phase/PhaseDescription
Aug 2006 StudyFeasibility Study contract awarded to Foster WheelerFoster WheelerLoading...
May 2007 PMCITB for contract overseeing FEED study issued
Jun 2007 FEEDITB issued
Q4 2007 FEEDBidders submitted their proposals
Nov 2007 PMCContract for the FEED study awarded to Fluor CorporationFluor CorporationLoading...
Jan 2008 FEEDContract awarded to BechtelBechtelLoading...
Aug 2008 ConsultantProprietary Technology contract awarded to Shaw Group
Sep 2008 ConsultantTechnology and Engineering Services contract awarded to UOP
May 2009 EPCContract for the dredging package awarded to Dredging International
07 Jun 2009 ConstructionDredging Started
Aug 2009 FEEDStudy completed
Nov 2009 EPCContracts for five packages awarded
May 2010 EPCContract for the non-process buildings package awarded to Ed Zueblin
2013 CompletionProject expected to be completed

Project News

10-May-2011 Ruwais refinery expansion on track - Gulf News
04-Nov-2010 Takreer pursues $10b expansion - Gulf News
08-Aug-2010 MESC wins $14 million order for Ruwais Refinery Expansion - Press Release
25-Mar-2009 Ruwais Refinery Project Bidding in June - Khaleej Times
11-Dec-2008 UAE to upgrade two refineries by 2011 - Gulf News
06-Aug-2008 FEED study of Takreer refinery expansion to be ready by next year - Khaleej Times
31-Aug-2006 Foster Wheeler awarded UAE refinery feasibility studies by TAKREER - Press Release
 
Al Khalifa Energy Complex, 11th-25th Floor, Khalifa Street, Corniche Area, P.O. Box 3593, Abu Dhabi, United Arab Emirates, Abu Dhabi
Tel: +971 2-602-7000 | Fax: +971 2-602-7001 | Email: publicrelations@takreer.com | Website: http://www.takreer.com
  • Name: Mohammed Yabouni
    Position: Engineering and Projects Division Manager
    Tel: +971 2-602-7391
    Fax: +971 2-602-7400
 
Bechtel Corporation
Consultant - FEED
H.E. Sh. Sultan Bin Surour Al Dhahiri Building, 15th floor, Al Salam Street, Abu Dhabi, Abu Dhabi, UAE
Tel: +971 2-699-8400 | Fax: +971 2-676-0899
 
Foster Wheeler International
Consultant - Feasibility Study
Bugatti Building, 1st floor, Al Corniche Street, Abu Dhabi, P.O. Box 26702, Abu Dhabi, UAE Tel: +971 2-622-2117 | Fax: +971 2-622-2119 | Website: http://www.fwc.com/
  • Name: Giancarlo Cotone
    Position: General Manager
    Tel: +971 2-622-2117
    Fax: +971 2-622-2119
    Email fwabudha@emirates.net.ae
  • Name: James Woolley
    Position: Resident Regional Manager
 
Shaw International Limited
Consultant - Proprietary Technology
Al Moosa Tower, 21st Floor, Sheikh Zayed Road, P.O. Box 74487, Dubai 70809, United Arab Emirates, Dubai
Tel: +971 4-312-8700 | Fax: +971 4-311-4969 | Email: shawgrp.dxb@gmail.com
 
UOP Middle East
Consultant - Technology and Engineering Services
Dubai World Trade Center Building, 25th floor, Dubai, P.O. Box 9248, Dubai, UAE Tel: +971 4-331-3841 | Website: http://www.uop.com/
 
Fluor Mideast Limited
PMC - Overseeing FEED
Al Obaidly Tower 5, 1st, 2nd, 14th and 15th Floor, Al Istiqlal Street, Khalidiya Area, P.O. Box 46858, Abu Dhabi, United Arab Emirates, Abu Dhabi
Tel: +971 2-617-2700 | Fax: +971 2-631-1660
  • Name: Jack Bielman
    Position: Contracts Director
    Tel: +965 325-2001
    +965 325-2401
    +965 325-2402
    Fax: +965 326-1043
    Email jack.bielman@fluor.com