Iraq MOO - Oil and Gas Pipeline Rehabilitation Project - Oil and Gas Pipeline (Phase 1)
Country : Iraq
Project Value : N/A
Sector : Oil and Gas | Transportation, Export/Import Terminal
PMC : SNC Lavalin Arabia Engineering Consultancy
Profile Type :  Contract Project
Associated Projects : Contract (2)
Phase:
PMC - Awarded
Completion: 2013
 
 
Owner : Ministry of Oil - IraqMinistry of Oil - IraqLoading... - Iraq
Location :
From 
South of Al Basra, Iraq
To 
West of Haditha, Al Anbar, Iraq
Development Type : BOT
Facility Type : Oil and Gas Pipeline
Capacity : 1.75 million bpd of oil  
643 km pipeline
Background The Iraqi Ministry of OilIraqi Ministry of OilLoading... plans to build an oil pipeline from Basra in the South of Iraq to Haditha, in the Western Anbar governorate in Iraq.

This project is phase one of the Ministry's plan to rehabilitate and expand the country's oil and gas pipeline network.

Phase one compromises a 1.75 million bpd pipeline from Basra in the South of Iraq to Haditha, in the Western Anbar governorate. At that point the pipeline will then split into two lines; one going westwards to the Syrian border and the other joining the northern export pipeline from Kirkuk to Ceyhan in Turkey.

The project will also include a natural gas pipeline to supply the pumping stations in addition to a storage terminal and tanks in Basra, Haditha and Baiji, 200km from Baghdad.

SNC LavalinSNC LavalinLoading... is the engineering consultant manager.
Expected Events
Schedule Contract Phase/Phase Description
H1 2012 BOTTendering and bidding process expected to be launched
2013 CompletionProject expected to be completed
Latest Events In November 2011, the project was under planning.

In H1 2012, the tendering and bidding process for the BOT contract is expected to be launched.

In 2013, the project is expected to be completed.
Previous Events On 10 May 2011, the engineering consultancy management contract was awarded to SNC LavalinSNC LavalinLoading....

In April 2011, the project was launched.

In 2007, the Iraqi Ministry of oil started planning for the project.
Scope of Work Construction of:

-A 1.75 million bpd of oil pipeline
-A natural gas pipeline
-A storage terminal and tanks
Contract Packages
Type Project Name Contract Value
Iraq MOO - Oil and Gas Pipeline Rehabilitation Project USD 50,000,000,000
Iraq MOO - Oil and Gas Pipeline Rehabilitation Project - Heavy Crude Oil Pipeline (Phase 2) -
Iraq MOO - Oil and Gas Pipeline Rehabilitation Project - Oil Export Pipelines (Phase 3) -

Project Schedule

ScheduleContract Phase/PhaseDescription
2007 PlanningPlanning for the project started
Apr 2011 AnnouncementProject launched
10 May 2011 ConsultantEngineering Consultancy Management contract awarded to SNC LavalinSNC LavalinLoading...
H1 2012 BOTTendering and bidding process expected to be launched
2013 CompletionProject expected to be completed
 
Oil Complex Building, Port Saeed Street, P.O. Box 6178, Baghdad, Iraq, Baghdad
| Email: oilministry@oil.goq.iq | Website: www.oil.gov.iq
  • Name: Sabah Abdulkadhem Al Saadi
    Position: Legal and Commercial Director
    Tel: +964 1-727-0711
  • Name: Abdulmahdi Al Ammedi
    Position: Head of Petroleum Contracts and Licensing Affairs
 
SNC Lavalin Arabia Engineering Consultancy
PMC 
API Tower 304-A, Sheikh Zayed Road, Dubai, Dubai, UAE
Tel: +971 4 331-6422 | Fax: +971 4 331-6421 | Website: http://www.snc-lavalin.com
  • Name: Harry Whatson
    Position: Project Manager
    Tel: +971 2-644-0001
  • Name: Khalid Ali
    Position: Business Development Manager
    Email khaled.ali@snclavalin.com
Key:    Master Project    Package Project    Contract Project
Print
 
  • SEARCH MIDDLE EAST PROJECTS
 
 
 
 
Panel