Gasco - Asab, Bab, Bu Hasa & Ruwais Gas Modifications - Asab Lean Gas Pipeline
Also Known As : ABBR
Country : UAE
Project Value : USD 84,000,000 Estimated
Sector : Oil and Gas | Processing & Separation, Transportation
Consultant : VECO Engineering (FEED)
PMCs : Worley Parsons (Overseeing EPC) |  Engineers India Limited (Overseeing FEED)
Contractor : Dodsal Engineering & Construction Private Limited (EPC)
Profile Type :  Contract Project
Associated Projects : Contract (2)
Completed
Completion: Oct 2011
 
 
Owner : Abu Dhabi Gas Industries LimitedAbu Dhabi Gas Industries LimitedLoading... - UAE
Location :
From 
Bab Field, Abu Dhabi, UAE
To 
Asab, Abu Dhabi, UAE
Contract Type : EPC - Engineering, Procurement, Construction
Facility Type : Pipeline
Capacity : 100 km pipeline
Background Abu Dhabi Gas Industry (GASCO)Abu Dhabi Gas Industry (GASCO)Loading... plans to construct a pipeline that links the Thamama C production facilities in Bab with the Asab facilities, in Abu Dhabi.

This project is part of the Asab, Bab, Bu Hasa & Ruwais (ABBR) Gas Modifications plan which aims at increasing oil and gas handling capacity by 150 million cu.ft./d.

Veco EngineeringVeco EngineeringLoading... is the FEED study consultant.

Engineers India Limited is the PMC overseeing the FEED study.

Worley ParsonsWorley ParsonsLoading... is the PMC overseeing the EPC.
Latest Events In the beginning of October 2011, the project was completed.
Previous Events In May 2011, commissioning of the facilities started.

In March 2011, construction was in the final stages.

In June 2010, construction of the facilities started.

In January 2010, the EPC contract was awarded to Dodsal Engineering and ConstructionDodsal Engineering and ConstructionLoading....

On 15 November 2009, commercial bids for the EPC contract were submitted (delayed from 31 September 2009).

In September 2009, the PMC contract overseeing the EPC contract was awarded to Worley ParsonsWorley ParsonsLoading....

In August 2009, technical bids for the EPC contract were submitted.

In May 2009, the ITB for the EPC contract was issued.

In March 2009, the FEED study was completed.

In October 2007, the FEED study contract was awarded to Veco EngineeringVeco EngineeringLoading... and the PMC contract overseeing the FEED study was awarded to Engineers India Limited.
Scope of Work Work includes:

- Construction of a 36-inch wide 100-km long pipeline
- Replacing an existing transit system for methane and ethane-rich lean gas
- Decommissioning of an existing pipeline
Contract Packages
Type Project Name Contract Value
Gasco - Asab, Bab, Bu Hasa & Ruwais Gas Modifications USD 1,000,000,000
Gasco - Asab, Bab, Bu Hasa & Ruwais Gas Modifications - Asab 3 USD 415,000,000
Gasco - Asab, Bab, Bu Hasa & Ruwais Gas Modifications - Bab Gas Processing Facilities USD 25,000,000

Project Schedule

ScheduleContract Phase/PhaseDescription
Oct 2007 FEEDContract awarded to Veco EngineeringVeco EngineeringLoading...
 PMCContract overseeing FEED awarded to Engineers India Limited
Mar 2009 FEEDStudy completed
May 2009 EPCITB issued
Aug 2009 EPCTechnical bids submitted
Sep 2009 PMCContract overseeing EPC contract awarded to Worley ParsonsWorley ParsonsLoading...
15 Nov 2009 EPCCommercial bids submitted
Jan 2010 EPCContract awarded to Dodsal Engineering and ConstructionDodsal Engineering and ConstructionLoading...
 
Prequalified Bidders Awarded
Jun 2010 EPCConstruction started
May 2011 CommissioningStarted
Oct 2011 CompletionProject completed
 
Sheikh Khalifa Energy Complex, Khalifa Street, P.O. Box 665, Abu Dhabi, United Arab Emirates, Abu Dhabi
Tel: +971 2-603-0000 | Fax: +971 2-603-7414 | Email: info@gasco.ae | Website: http://www.gasco.ae
  • Name: Khaled Ghanem
    Position: Project Manager
    Tel: +971 2 -603 -1114
 
VECO Engineering
Consultant - FEED
Khalaf Bin Ahmad Al Otaiba Building, 18th Floor, Office 1304, Electra Street, Electra Area, P.O. Box 45570, Abu Dhabi, United Arab Emirates, Abu Dhabi
Tel: +971 2-634-6640 | Fax: +971 2-634-4503
 
Dubai National Insurance Building, 1st, 2nd and 3rd Floor, Sheikh Zayed Road, P.O. Box 8034, Dubai, United Arab Emirates, Dubai
Tel: +971 4-343-1515 | Fax: +971 4-310-6777,+971 4-343-4757 | Email: mail@dodsaldxb.ae
 
Worley Parsons
PMC - Overseeing EPC
Al Masaood Tower, 8th floor, Najda Street, Abu Dhabi, Abu Dhabi 44169, UAE
Tel: +971 2-676-6439 | Fax: +971 2-671-2097 | Website: www.worleyparsons.com
  • Name: Fouad Bekdash
    Position: General Projects Manager
    Tel: +971 2-495-1404
 
Engineers India Limited
PMC - Overseeing FEED
1 Bhikaiji Cama Place Building, India
Tel: +91 11-2610-2121 | Fax: +91 11-2617-8210 | Website: www.emgineersindia.com
Key:    Master Project    Package Project    Contract Project
Print
 
  • SEARCH MIDDLE EAST PROJECTS
 
 
 
 
Panel