SAGIA - King Abdullah Economic City (KAEC) - Phase 1 - Sea Port
Also Known As : KAEC Sea Port
Country : Saudi Arabia
Project Value : USD 26,600,000,000
Sector : Infrastructure | Ports
Consultant : Halcrow International Partnership (Design)
Contractor : Saudi Binladin Group (BOT)
Profile Type :  Contract Project
Associated Projects : Contract (7)
Phase:
Construction - Execution
Completion: 2020
 
 
Owner : Saudi Arabian General Investment AuthoritySaudi Arabian General Investment AuthorityLoading... - Saudi Arabia
Developer : Port Development Company
Location :
Rabigh, Makkah , Saudi Arabia
Contract Type : BOT - Build, Operate, Transfer
Capacity : 20 million TEU. 
 
Phase 1: 3.8 million TEU 
Phase 2: 6 million TEU
Background Saudi Arabian General Investment Authority (SAGIA)Saudi Arabian General Investment Authority (SAGIA)Loading... plans to develop a new sea port in King Abdullah Economic City (KAEC) between Jeddah and Rabigh, Saudi Arabia.

The sea port project will be developed on an area of 14 million sq. m. and will have a capacity of 20 million TEU per year.

The port's capacity will increase in phases. Phase 1 will have a capacity of 3.8 million TEU and phase 2 will have a capacity of 6 million TEU.

The port will be designed to receive new generation mega vessels, utilize global positioning technologies, advanced information management and automated process systems.

Once completed, the port will consist of a hajj terminal capable of handling 300,000 pilgrims during the hajj season.

KAEC is a 168 million sq. m. economic city divided into 6 zones: a seaport, an industrial district, a residential district, a financial island, an education zone and a waterside resort.

HalcrowHalcrowLoading... is the design consultant.
Expected Events
Schedule Contract Phase/Phase Description
2017 CompletionPhase 2 expected to be completed
2020 CompletionProject expected to be completed
Latest Events In April 2012, the construction of the port was ongoing.

In 2017, phase 2 is expected to be completed.

In 2020, the project is expected to be completed.
Previous Events In May 2011, phase 1 of the dredging works was completed.

In March 2010, the construction of the water, electrical, telecommunication networks and 50 km of roads were completed.

In October 2009, the BOT contract was awarded to Saudi BinladinSaudi BinladinLoading... and the dredging works started.

In September 2009, the JV company, Port Development Company (PDC), was established between Emaar Economic CityEmaar Economic CityLoading... and Saudi BinladinSaudi BinladinLoading... Group.

In January 2009, the design was completed.

In April 2008, Emaar E.CEmaar E.CLoading... signed a memorandum of understanding (MoU) with Dubai-based DP WorldDP WorldLoading... to develop and operate the port.
Scope of Work Construction of a seaport including:

- Infrastructure works including water, electrical, telecommunication and road networks
- 10 container berths
- a hajj terminal
- cargo terminals and other related facilities
Contract Packages
Type Project Name Contract Value
SAGIA - King Abdullah Economic City (KAEC) USD 27,000,000,000
EEC - KAEC Desalination Plant USD 75,000,000
EEC- KAEC Power Generation Grid -
EEC- KAEC Power Plant -
SAGIA - King Abdullah Economic City (KAEC) - Hawadi Development -
SAGIA - King Abdullah Economic City (KAEC) - Phase 1 -
SAGIA - King Abdullah Economic City (KAEC) - Phase 1 - Industrial Zone USD 6,000,000,000
SAGIA - King Abdullah Economic City (KAEC) - Water Canals USD 66,000,000
Project News
23-Mar-2010 EEC completes 50 km of roads at King Abdullah Economic City - Arab News
06-Apr-2008 Emaar EC, DP World in deal to develop KAEC Sea Port - The Saudi Gazette
06-Apr-2008 Emaar EC, DP World to develop Saudi seaport - Khaleej Times
06-Apr-2008 Emaar, DP World Sign Sea Port Deal - Arab News
06-Apr-2008 Emaar and DP World sign deal to develop seaport - Gulf News
05-Apr-2008 Emaar, The Economic City and DP World sign MoU to develop King Abdullah Economic City Sea Port - Press Release
» More News

Project Schedule

ScheduleContract Phase/PhaseDescription
Apr 2008 PlanningSigning of MoU
Jan 2009 DesignDesign was completed
Sep 2009 PlanningPorts Development Company established
Oct 2009 ConstructionDredging works started
 BOTBOT contract awarded to Saudi BinladinSaudi BinladinLoading...
May 2011 CompletionPhase 1 of dredging works completed
2017 CompletionPhase 2 expected to be completed
2020 CompletionProject expected to be completed

Project News

23-Mar-2010 EEC completes 50 km of roads at King Abdullah Economic City - Arab News
06-Apr-2008 Emaar EC, DP World in deal to develop KAEC Sea Port - The Saudi Gazette
06-Apr-2008 Emaar EC, DP World to develop Saudi seaport - Khaleej Times
06-Apr-2008 Emaar, DP World Sign Sea Port Deal - Arab News
06-Apr-2008 Emaar and DP World sign deal to develop seaport - Gulf News
05-Apr-2008 Emaar, The Economic City and DP World sign MoU to develop King Abdullah Economic City Sea Port - Press Release
 
Saudi Arabian General Investment Authority Building, Imam Saud Bin Abdulaziz Road, P.O. Box 5927, Riyadh 11432, Saudi Arabia, Riyadh
Tel: +966 1-203-5555 | Fax: +966 1-263-2894 | Email: info@sagia.org | Website: www.sagia.gov.sa
  • Name: Fahed Abdulmohsen Al Rasheed
    Position: Deputy Governor, Economic Cities Affairs and Finance and Strategic Planning Manager
    Tel: +966 1-448-4533
 
Halcrow International Partnership
Consultant - Design
Halcrow International Partnership Building, Al Maktoum Bridge Street, Oud Metha, P.O. Box 360, Dubai, United Arab Emirates, Dubai
Tel: +971 4-337-0380 | Fax: +971 4-337-9239 | Email: hme-dubai@halcrow.com
 
Saudi Binladin Group
Contractor - BOT
Binladin Group Building, Al Rawda Street, Al Rawdah District, P.O. Box 9887, Jeddah 21423, Saudi Arabia, Makkah
Tel: +966 2-664-3033 | Fax: +966 2-664-3225 | Email: mail@sbg.com.sa | Website: www.sbg.com.sa
  • Name: Motaz Al Sawaf
    Position: Projects Director
    Tel: +966 2-616-3938
 
DP World
Developer - Sub-developer
Building LOB 17, Ground and 5th Floor, Jebel Ali Free Zone, P.O. Box 17000, Dubai, United Arab Emirates, Dubai
Tel: +971 4-881-1110 | Fax: +971 4-881-1331 | Email: info@dpworld.com | Website: www.dpworld.com,http://www.dpworld.ae
 
Port Development Company
Developer 
C/O 24 North Building C, Prince Sultan Street, Makkah, P.O. Box 8299, Jeddah 21482, Saudi Arabia Tel: +966 2-615-9999 | Fax: +966 2-420-2868
  • Name: Ahmad Linjawy
    Position: Executive Business Development Director
    Tel: +966 2-615-9999
    Fax: +966 2-699-9988
  • Name: Rania Sulamani
    Position: PR Manager
    Tel: +966 2-615-9704
Key:    Master Project    Package Project    Contract Project
Print
 
  • SEARCH MIDDLE EAST PROJECTS
 
 
 
 
Panel