ADNOC/Oxy - Gasco - Sour Gas Fields Development - Shah Field - Sulphur Treatment Facilities at Habshan (Package 7A)
Also Known As : Habshan Sulphur Granulated Plant
Country : UAE
Project Value : USD 500,000,000 Estimated
Sector : Oil and Gas | Processing & Separation
Consultant : Fluor Mideast Limited (FEED)
PMC : Fluor Mideast Limited
Contractor : Dodsal Engineering & Construction Private Limited (EPC)
Profile Type :  Contract Project
Associated Projects : Contract (10)
Phase:
EPC - Execution
Completion: Q3 2013
 
 
Owner : Jv of Abu Dhabi National Oil Company and Occidental Middle East Development Company
Developer : Abu Dhabi Gas Industries LimitedAbu Dhabi Gas Industries LimitedLoading... - UAE
Shareholders : Abu Dhabi National Oil CompanyAbu Dhabi National Oil CompanyLoading... - UAE - 60.00 %
Occidental Oil and Gas InternationalOccidental Oil and Gas InternationalLoading... - United States - 40.00 %
Location :
Habshan, Abu Dhabi, UAE
Development Type : BOO
Contract Type : EPC - Engineering, Procurement, Construction
Payment Terms : Lump Sum Turnkey (LSTK)
Facility Type : Sulphur forming, granulation and handling facilities
Capacity : 5,000,000 t/y of sulphur
Background Abu Dhabi Gas IndustriesAbu Dhabi Gas IndustriesLoading... (GascoGascoLoading...) plans to construct sulphur forming, granulation and handling facilities located approximately 16 km south east of the existing Habshan Gas Plant Complex and about 32 km south of the intersection of Highway E11 and Tarif (Abu Al Abyadh), UAE.

The project is package 7A of the Shah Sour Gas Field Development project. It belongs to the series of developments that aim at increasing the sulphur production capacity to 7 million t/y by 2015.

The facilities will be used to granulate sulphur which will be transported in its solid form by rail to the sulphur handling terminal at Ruwais.

Fluor CorporationFluor CorporationLoading... is the PMC and the FEED study consultant.
Expected Events
Schedule Contract Phase/Phase Description
Q3 2013 CompletionProject expected to be completed
Latest Events In May 2012, construction of the facilities was ongoing.

In Q3 2013, the project is expected to be completed.
Previous Events In November 2011, construction of the facilities started.

In September 2011, engineering work was ongoing.

In February 2011, engineering works were in progress.

On 19 January 2011, the BOO Developer contract was officially signed between ADNOCADNOCLoading... and Occidental PetroleumOccidental PetroleumLoading... Corporation.

On 1 January 2011, the EPC contract was awarded to Dodsal Engineering and ConstructionDodsal Engineering and ConstructionLoading.... Site preparations and engineering works started.

On 22 November 2010, commercial bids for the EPC contract were submitted. Dodsal Engineering and ConstructionDodsal Engineering and ConstructionLoading... was the lowest bidder.

On 21 September 2010, technical bids for the EPC contract were submitted (delayed for the second time from 17 August 2010).

In July 2010, the ITB for the EPC contract was issued.

In June 2010, GascoGascoLoading... invited companies to submit their EOI for the EPC contract. The tendering for the project was delayed due to the alteration in the scope of the project related to sulphur transportation.

On 21 June 2010, the PMC contract overseeing the overall program was awarded to Fluor CorporationFluor CorporationLoading....

In May 2009, Fluor CorporationFluor CorporationLoading... completed the FEED study.
Scope of Work The project includes the construction of:

- Sulphur forming, granulation and handling facilities
- 150 Km of electrically heated pipelines
- Overhead power lines
- Storage facilities of liquid sulphur and granulated sulphur
- Blocking, railcar and loading utilities
Contract Packages
Type Project Name Contract Value
ADNOC/Oxy - Sour Gas Fields Development - Shah Field USD 10,000,000,000
ADNOC - Sour Gas Fields Development - Shah Field - Liquid Sulphur Pipeline (Package 6) -
ADNOC/Oxy - Sour Gas Fields Development - Shah Field - Offsites & Utilities (Package 4) -
ADNOC/Oxy - Gasco - Sour Gas Fields Development - Shah Field - Sulphur Handling and Export Terminal (Package 8) USD 614,000,000
ADNOC/Oxy - Sour Gas Fields Development - Shah Field - Early Works (Package 9) USD 300,000,000
ADNOC/Oxy - Sour Gas Fields Development - Shah Field - Gas Gathering System (Package 1) USD 470,000,000
ADNOC/Oxy - Sour Gas Fields Development - Shah Field - Non Process Buildings (Package 10) USD 600,000,000
ADNOC/Oxy - Sour Gas Fields Development - Shah Field - Process Plant (Package 2) -
ADNOC/Oxy - Sour Gas Fields Development - Shah Field - Product Pipelines (Package 5) USD 196,000,000
ADNOC/Oxy - Sour Gas Fields Development - Shah Field - Sulphur Recovery Units (Package 3) USD 1,450,000,000
ADNOC/Oxy - Sour Gas Fields Development - Shah Field - Sulphur Treatment Facilities at Shah (Package 7B) USD 550,000,000
Project News
20-Jan-2011 Occidental to partner Adnoc in Shah gas project - Gulf News

Project Schedule

ScheduleContract Phase/PhaseDescription
May 2009 FEEDStudy completed by Fluor corporation
21 Jun 2010 PMCContract awarded to Fluor corporation
Jun 2010 EPCCompanies invited to submit their EOI's
Jul 2010 EPCITB issued
21 Sep 2010 EPCTechnical bids submitted
22 Nov 2010 EPCCommercial bids submitted
Dec 2010 EPCSite preparations and engineering works started
01 Jan 2011 EPCContract awarded to Dodsal Engineering and ConstructionDodsal Engineering and ConstructionLoading...
19 Jan 2011 BOOContract officially signed between ADNOCADNOCLoading... and Occidental PetroleumOccidental PetroleumLoading... Corporation
Nov 2011 EPCConstruction started
Q3 2013 CompletionProject expected to be completed

Project News

20-Jan-2011 Occidental to partner Adnoc in Shah gas project - Gulf News
 
Jv of Abu Dhabi National Oil Company and Occidental Middle East Development Company
Owner 
Occidental Towers, 4th Street, Muroor Area, P.O. Box 73243, Abu Dhabi, United Arab Emirates
Tel: +971 2-691-7200 | Fax: +971 2-645-0395
  • Name: Nicola Nansour
    Position: Senior Executive Assistant
    Email nicola_nansour@oxy.com
  • Name: John Newbery
    Position: Business Development Director
Abu Dhabi National Oil Company Building, Corniche Street, P.O. Box 898, Abu Dhabi, United Arab Emirates
Tel: +971 2-602-0000 | Fax: +971 2-602-3389 | Email: info@adnoc.ae | Website: http://www.adnoc.ae
 
Fluor Mideast Limited
Consultant - FEED
Al Obaidly Tower 5, 1st, 2nd, 14th and 15th Floor, Al Istiqlal Street, Khalidiya Area, P.O. Box 46858, Abu Dhabi, United Arab Emirates, Abu Dhabi
Tel: +971 2-617-2700 | Fax: +971 2-631-1660
 
Dubai National Insurance Building, 1st, 2nd and 3rd Floor, Sheikh Zayed Road, P.O. Box 8034, Dubai, United Arab Emirates, Dubai
Tel: +971 4-343-1515 | Fax: +971 4-310-6777,+971 4-343-4757 | Email: mail@dodsaldxb.ae
 
Al Obaidly Tower 5, 1st, 2nd, 14th and 15th Floor, Al Istiqlal Street, Khalidiya Area, P.O. Box 46858, Abu Dhabi, United Arab Emirates, Abu Dhabi
Tel: +971 2-617-2700 | Fax: +971 2-631-1660
 
Sheikh Khalifa Energy Complex, Khalifa Street, P.O. Box 665, Abu Dhabi, United Arab Emirates, Abu Dhabi
Tel: +971 2-603-0000 | Fax: +971 2-603-7414 | Email: info@gasco.ae | Website: http://www.gasco.ae
  • Name: Abdulaziz Al Ameri
    Position: Assistant General Manager, Projects
 
Occidental Towers, 4th Street, Muroor Area, P.O. Box 73243, Abu Dhabi, United Arab Emirates, Abu Dhabi
Tel: +971 2-691-7200 | Fax: +971 2-645-0395
  • Name: Nicola Nansour
    Position: Senior Executive Assistant
    Email nicola_nansour@oxy.com
  • Name: John Newbery
    Position: Business Development Director
Key:    Master Project    Package Project    Contract Project
Print
 
  • SEARCH MIDDLE EAST PROJECTS
 
 
 
 
Panel