GCC Grid Interconnection Phase I
Country : Bahrain, Saudi Arabia, Qatar, Kuwait
Project Value : USD 1,190,000,000 Estimated
Sector : Power and Water | Power Transmission & Distribution
Consultant : SNC-Lavalin Group Incorporation
Profile Type :  Master Project
Completed
Completion: Jul 2009
 
 
Owner : Gulf Cooperation Council Interconnection AuthorityGulf Cooperation Council Interconnection AuthorityLoading... - Saudi Arabia
Location :
Saudi Arabia
Qatar
Bahrain
Kuwait
Contract Type : EPC - Engineering, Procurement, Construction
Payment Terms : Lump Sum Turnkey (LSTK)
Facility Type : Electricity grid facilities
Background GCC Interconnection AuthorityGCC Interconnection AuthorityLoading... plans to develop the GCC Grid Interconnection Phase I to connect the power networks of Saudi Arabia, Kuwait, Bahrain and Qatar.

The phase 1 project is divided into five packages covering 13 lots to install back to back stations and to setup transmission lines as well as control centers.

The grid is designed to reduce the need for spinning reserve and to increase security in case of any power shortages in the region.

SNC LavalinSNC LavalinLoading... is the overall project consultant.

The GCC Grid project will be carried out in three phases. Phase 2 will link the UAE with Oman. All GCC states will be linked up in the final phase.
Latest Events In July 2009, the project was completed.

In April 2009, the electricity connection between Qatar and Saudi Arabia was completed.

In March 2009, 91% of the project was completed.

In August 2008, 83% of the project was completed.

In January 2008, 50% of the project was completed.

In November 2005, the EPC contracts were awarded to ABBABBLoading... for the six substations package, Pirelli with Nexans for the submarine link package, Areva T&D for the converter station package & grid control center and NCCNCCLoading... with MeedcoMeedcoLoading... for the overhead lines package.
Scope of Work Construction of six substations, a HVDC (high-voltage direct-current) converter station, double-circuit transmission line, submarine cable, a control centre and a telecommunications network.
Financing Source GCC Grid Interconnection Project Phase I is funded through 65% debt 35 % equity by the governments of Kuwait, Saudi Arabia, Bahrain and Qatar.

40% of the cost will be funded by Saudi Arabia, 36.5% by Kuwait, 13.5% by Qatar and 10% funded by Bahrain.

Gulf Investment Corporation is the financial adviser.
Project News
06-Jul-2010 GCCIA Operates 1st Phase of Gulf Electricity-Grid Project - Saudi Press Agency
15-Dec-2009 GCC power grid launched - Arab News
04-Jul-2009 GCC states to sign power swap deal - Emirates 24|7
24-Jun-2009 Gulf power grid to open on Sunday - Gulf News
19-Apr-2009 Qatar, Saudi link up to power grid - The Peninsula
28-Oct-2008 Palestine joins grid project - Jordan Times
27-Oct-2008 Gulf Close To Energy Agreement - 7Days
27-Oct-2008 Phase I of GCC power grid 80% done - Emirates 24|7
27-May-2008 GCC Grid Phase I to come online in 2009 - Emirates 24|7
19-Mar-2008 GCC will invite bids for single electricity grid - Emirates 24|7
» More News
» More News

Project Schedule

ScheduleContract Phase/PhaseDescription
Oct 2004 EPCContract awarded to NCCNCCLoading... & MeedcoMeedcoLoading... - overhead lines package
Oct 2005 EPCContract awarded to ABBABBLoading... - substations package
 EPCContract awarded to Pirelli and Nexans - submarine link package
 EPCContract awarded to Areva T&D - converter station package
Q1 2009 CompletionProject was expected to be completed
Apr 2009 CompletionElectricity connection between Qatar and Saudi Arabia was completed
Jul 2009 CompletionProject was completed

Project News

06-Jul-2010 GCCIA Operates 1st Phase of Gulf Electricity-Grid Project - Saudi Press Agency
15-Dec-2009 GCC power grid launched - Arab News
04-Jul-2009 GCC states to sign power swap deal - Emirates 24|7
24-Jun-2009 Gulf power grid to open on Sunday - Gulf News
19-Apr-2009 Qatar, Saudi link up to power grid - The Peninsula
28-Oct-2008 Palestine joins grid project - Jordan Times
27-Oct-2008 Gulf Close To Energy Agreement - 7Days
27-Oct-2008 Phase I of GCC power grid 80% done - Emirates 24|7
27-May-2008 GCC Grid Phase I to come online in 2009 - Emirates 24|7
19-Mar-2008 GCC will invite bids for single electricity grid - Emirates 24|7
» More News
 
Al Raja Tower, 4th Floor, Khobar Dammam Highway, Al Sharqiyah Area, P.O. Box 3894, Dammam 31481, Saudi Arabia, Al Sharqiyah
Tel: +966 3-887-0840 | Fax: +966 3-882-6801 | Email: info@gccia.com.sa | Website: www.gccia.com.sa
  • Name: Hassan Al Asaad
    Position: Project Manager
    Tel: +966 3-887-0840 ext:104
    Email helasaad@gccia.com.sa
 
18 rue Mustapha Khalef, Ben Aknoun, Algiers, Algeria
Tel: +213 21-911750 | Fax: +213 21-911758 | Website: http://www.snclavalin.com