Contact us | +971 4 3635663
Sponsored by   Mudabala
 
 
BETA
Loading Loading ...
Mon, 09 Nov 2009 | 01:33 GMT
 

Oil wastes from restaurants to fuel biodiesel plant

Gulf News
 
 

Thursday, Dec 25, 2008

Gulf News

Dubai: Grease and oil from restaurants across the UAE will be the primary source of fuel for the upcoming biodiesel plant in the Al Ain industrial area. This was announced earlier this year.

Plans to use plants, weeds or some form of crop oil are not on the agenda of Ecobility, the founders behind EmBio, the first biodiesel plant in the GCC region.

Karim Ali, the co-founder of Ecobility, said waste oil from restaurants, food production companies and the hospitality sector would be approached for their waste cooking oils and grease.

Ali said this may reduce illegal dumping of grease and create a carbon-friendly fuel.

Reducing waste

"We will target the private sector for our feedstock," he said. Crops associated with biodiesel such as jatropha, soy or corn currently being used in other parts of the world are not being considered yet by EmBio.

Jatropha, a weed, grows on infertile and arid land and does not need to be watered with potable water as it is not grown for human consumption.

"Grey water can be used as these crops are not edible and are just being watered to hydrate them. The water can be used again and again. However we have no plans to ever plant them anywhere," he told Gulf News.

With an initial annual production of three million gallons, Ali is aware that this amount of 100 per cent biodiesel will not answer the UAE's need for an alternative to petrol.

"We will sell at wholesale and not at retail level. Courier companies could switch to a biodiesel blend to reduce their carbon footprint for example. We will buy waste oils from a company and sell them biodiesel in return," said Ali.

"Three million is a conservative volume. The plant will be modular so we can scale up. We can go up 10-fold," he added.

100% eco friendly

Ecobility is backing a sustainable building material, recently available in the UAE, made from 100 per cent recycled paper and cashew nut resin.

The combination has produced Paper Stone which is completely water proof and as tough as marble. "Paper Stone can be used for facades or counter tops and qualifies for sustainability points for green buildings," said Aly.

Paper Stone is 80 per cent recycled paper and 20 per cent cashew nut resin. Depending on the finish it can be used indoors or outdoors.

"It can withstand 300 degree Celsius which makes it suitable for counter tops and putting hot pots or dishes down . It can also be moulded to fit around a sink with drainage grooves to avoid having stainless steel sinks," he said.

"Nobody uses the shells of cashew nuts which is where the resin comes from. This product is about four years old and manufactured in the US. It has been specified for outdoor cladding of buildings."

© Gulf News 2008. All rights reserved.

 
 
 
Community Comments (0) - Comment on this article
The opinions of the authors expressed herein do not necessarily state or reflect Zawya. Read our Comment Policy.
 
 
 
Loading ...
 
Report Abuse
Loading ...
 
 
Loading ...
Zawya Comment Policy:
 
  1. Zawya encourages you to add a comment to this discussion. You agree that when you add content to this discussion your comments will not:
    1.1   Contain any material which is libelous or defamatory of any person, is obscene, offensive, hateful or inflammatory or causes damage to the reputation of any person or organisation.
    1.2   Promote sexually explicit material, violence, discrimination based on race, sex, religion, nationality, disability, sexual orientation or age or any illegal activity.
    1.3   Be made in breach of any legal duty owed to a third party, such as a contractual duty or a duty of confidence.
    1.4   Be threatening, abuse or invade another's privacy, or cause annoyance, inconvenience or needless anxiety.
    1.5   Be used to impersonate any person, to misrepresent your identity or affiliation with any person, or be likely to deceive any person.
    1.6   Give the impression that they represent Zawya.
    1.7   Advocate, promote or assist any unlawful act such as (by way of example only) copyright infringement or computer misuse.
  2. The content posted on www.zawya.com is created by members of the public. The views expressed are theirs and unless specifically stated are not those of Zawya. Zawya reserves the right to review all comments prior to posting and edit or delete any contribution, but Zawya is not responsible for and can not be held liable for any content posted by members of the public on www.zawya.com.
  3. Zawya is not responsible for the availability or content of any third party sites that are accessible through www.zawya.com. Any links to third party websites from www.zawya.com do not amount to any endorsement of that site by Zawya and any use of that site by you is at your own risk.
  4. By submitting your comment, you hereby give Zawya the right, but not the obligation, to post, air, edit, exhibit, telecast, webcast, re-use, publish, reproduce, use, license, print, distribute or otherwise use your comments worldwide, in perpetuity.
 
 
 
 
 
 
 
Post Your Tender Notices for FREE
(No Sign-in Required)
 
 
Oil and Gas Tenders Due Date
TURNAROUND MAINT WORKS AT FAHAHIL PLANTS WITHIN DUKHN FIELDS 22Nov09
IMPLEMENTATION OF MISC. PLANT CHANGE REQUESTS(PCRS) at HALUL 15Nov09
Supply of Computers and Provision of Technical Support Package - Kuwait Petroleum Corporation 13Dec09
Installation, Operation & Maintenance of Internet Service & Communication Lines - KUWAIT PETROLEUM CORPORATION 09Nov09
Oracle Program Licensing - KUWAIT PETROLEUM CORPORATION 01Dec09
Prequalification for Off-Plot Delivery Contract (ODC) 31Dec09
Shah Gas Field - Offsite Package 31Dec09
Maintenance Works for Outdoor Plants and Irrigation Systems - KUWAIT PETROLEUM CORPORATION 01Dec09
HOOK UP OF FLOWLINE,PWI & GASLIFT WELLS 13Dec09
Supply of Pipe Casings “5” and Digging Pipes 3-1/2, 3-1/2 – “5” Casing 22Nov09
Qarn Alam Power Station Phase 3 21Nov09
Shah Gas Field - Main Process Package 31Dec09
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) OF SEA WATER SUPPLY PROJECT AT SOHAR REFINERY 16Nov09
Off Plot Construction Contract for Amal Steam Surface Facilities 07Feb10
Maintenance of Photocopiers and Accessories - KUWAIT PETROLEUM CORPORATION 06Dec09
UPGRADE OF UPS SYSTEMS,BATTERY CHARGERS&BATTERY BANKS AT NFA 29Nov09
Supply of Chemicals for three Company Refineries - Kuwait National Petroleum Company 08Dec09
Supply, Design and Construction Works for New Liquefied Gas Filling Plant Project (Umm Al Aish) - Kuwait Oil Tanker Company 25Jan10
First Project EF/1713 : Construction of Oil and Gas Pipelines at Mina Al Ahmadi To Subiya and Doha Power Stations Second Project EF/1760 : Construction of Pumping Station and Oil and Gas Pipelines at Mina Al Ahmadi To Al Zoor and Shuaiba Power Stations 07Feb10
On Plot Construction Contract for Amal Steam Surface Facilities 07Feb10
 »  More Tenders
 
 
 
Community Buzz

Stories

Companies

Most viewed companies by Community in the last 24 hrs
Company Name Country Industry
Consolidated Contractors Company Overseas Construction and Design
Saudi Binladin Group Saudi Arabia Construction and Design
Saudi Telecom Saudi Arabia Telecommunications Services
Saudi Electricity Company Saudi Arabia Electric Utilities
Emirates Aluminium Company UAE Metal Production
Sharjah Electricity and Water Authority UAE Electric Utilities
Emirates Telecommunications Corporation UAE Telecommunications Services
Al Azizia Panda United Company Saudi Arabia General Retailers
Commercial International Bank (Egypt) Egypt Banking
Dodsal Engineering and Construction UAE Construction and Design
 

Projects

Most viewed projects by Community in the last 24 hrs
Project Name Country Sector
Takreer - Ruwais Refinery Expansion UAE Oil and Gas
Al Futtaim Carillion - Marina Hotel (Yas Island) UAE Real Estate
Emirates Aluminium (EMAL) - Smelter Complex - Phase 1 UAE Industry
Abu Dhabi DOT - Abu Dhabi Metro UAE Infrastructure
ENEC - Nuclear Power Plant UAE Power and Water
SATORP - Jubail Refinery and Petrochemical Complex Saudi Arabia Oil and Gas
Dubai RTA - Dubai Metro UAE Infrastructure
Al Safwa - Jeddah Cement Plant Saudi Arabia Industry
Qatar Bahrain Causeway Foundation - Qatar Bahrain Causeway Bahrain Infrastructure
Qatar Bahrain Causeway Foundation - Qatar Bahrain Causeway Qatar Infrastructure
 

Blogs

 
 

 
 
 
 
 

Site is optimised for viewing at 1024 x 768 with Internet Explorer v6 and Firefox v3.0 and above.
Copyright © 2009 ABQ Zawya Ltd. All rights reserved. Please read our Membership Agreement